+
21
TUESDAY, MAY 24, 1988
LANE NEAR SAN TIN WAI
то (THURSDAY)
6 AM THE
A 130-METRE LONG SECTION OF THE SLOW ESTATE WILL BE CLOSED FROM 10 PM ON MAY 26 FOLLOWING DAY AND FROM 11 PM ON MAY 27 TO 6 AM ON MAY 28.
2
AND
6
AM
THE
FOLLOWING
BETWEEN 10 PM ON JUNE BETWEEN 11 PM ON JUNE 3 AND 6 AM ON JUNE 4, A 100-METRE OF THE SLOW LANE NEAR KAK TIN WILL ALSO BE CLOSED.
DAY,
AND LONG SECTION
SECTION OF
THE SLOW LANE NORTH OF HUNG MUI KUK INTERCHANGE, A ABOUT 120 METRES IN LENGTH, WILL BE CLOSED FROM 10 PM ON JUNE 6 TO 6 THE FOLLOWING AM THE FOLLOWING DAY, AND FROM 11 PM ON JUNE 7 TO 6 AM DAY.
NEAR HUNG MUI KUK A 220-METRE LONG SECTION OF THE SLOW LANE
JUNE 9 AND 6 AM THE INTERCHANGE WILL BE CLOSED BETWEEN 10 PM ON
PM ON JUNE 10 AND 6 AM ON JUNE 11. FOLLOWING DAY, AND BETWEEN 11
11 PM FROM 10 PM ON JUNE 14 TO 6 AM THE NEXT DAY AND FROM
NORTH OF HUNG MUI JUNE 15 TO 6 AM THE NEXT DAY, THE SLOW LANE ROAD, A SECTION OF ABOUT 90 METRES IN LENGTH, WILL ALSO BE CLOSED.
ON KUK
TAI PO ROAD CLOSURE FOR ROUTE 5 WORK
ROUTE TO FACILITATE THE CONSTRUCTION OF THE SHA TIN SECTION OF
FROM ITS JUNCTION WITH 5, THE NORTHBOUND CARRIAGEWAY OF TAI PO ROAD, FROM ITS
POINT
160 ABOUT
SAME SHING CHUEN ROAD TO A
SOUTH OF THE JUNCTION, WILL BE CLOSED TO TRAFFIC FROM 10 AM ON THURSDAY (MAY 26).
METRES
THE CLOSURE WILL BE IN FORCE FOR ABOUT 12 MONTHS.
NORTHBOUND HEADING FOR THE ALL VEHICLES ON TAI PO ROAD
NEW 85, 86, TERRITORIES, INCLUDING KMB ROUTES NO. 48A, 72, 72A, 80K, 81,
WILL BE DIVERTED VIA A NEWLY 87, 88K AND GREEN MINIBUS ROUTE NO. 61M,
TUNG LO WAN CONSTRUCTED TEMPORARY ROAD AND THE UNNAMED ROAD EAST OF
JUNCTION WITH SHING PLAYGROUND BEFORE RE-JOINING TAI PO ROAD AT ITS CHUEN ROAD.
BUS STOP USED BY NORTHBOUND SUSPENDED. A TEMPORARY NEWLY CONSTRUCTED ROAD, BESIDE
A
AT THE SAME TIME, THE EXISTING BUSES ON THAT SECTION OF TAI PO ROAD WILL BE BUS STOP WILL BE PROVIDED ON TUE PETROL STATION.
/22