WEDNESDAY, MAY 4, 1988

49

TEMPORARY RESTRICTED ZONE ON CONNAUGHT ROAD CENTRAL

THE SOUTHERN KERBSIDE LANE OF WESTBOUND CONNAUGHT ROAD CENTRAL BETWEEN QUEEN VICTORIA STREET AND JUBILEE STREET WILL BE DESIGNATED AS A 7 AM TO 7 PM DAILY RESTRICTED ZONE FROM 10 AM ON SATURDAY

(MAY 7).

WORKS.

THIS MEASURE WILL LAST FOR ABOUT SIX WEEKS FOR CABLE LAYING

NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE FOR PASSENGERS OR GOODS THERE.

ALLOWED ΤΟ STOP

-

-

AT THE SAME TIME, THE EXISTING GOODS VEHICLE PEAK HOUR (7 AM 10 AM AND 4 PM

ON THE 7 PM) DAILY RESTRICTED ZONE

SAME SECTION OF CONNAUGHT ROAD CENTRAL WILL BE TEMPORARILY LIFTED.

URBAN CLEARWAY RESTRICTION IN KWAI CHUNG

TO IMPROVE TRAFFIC FLOW, THE KERBSIDE LANE OF TAI LOONG IN KWAI CHUNG BETWEEN WO YI HOP ROAD AND TAI PAK TIN STREET MADE A 7 AM TO 7 PM DAILY URBAN CLEARWAY FROM 10 AM ON

(MAY 7).

STREET WILL BE SATURDAY

NO VEHICLES WILL BE ALLOWED TO STOP WITHIN THE FOR PASSENGERS OR GOODS.

URBAN

CLEARWAY

URBAN CLEARWAY RESTRICTION LIFTED

(7 AM

-

FROM 10 AM

ON

10 AM AND 4 PM

FRIDAY (MAY 6), THE EXISTING PEAK-HOUR

7 PM) DAILY URBAN CLEARWAY RESTRICTION ON THE NORTHERN KERBSIDE LANE OF A SECTION OF TSUEN NAM ROAD IN SHA TIN WILL BE LIFTED.

THE SECTION IS BETWEEN A POINT ABOUT 30 METRES WEST OF TSUEN NAM ROAD'S JUNCTION WITH CHIK LUK LANE AND A POINT ABOUT 35 METRES EAST OF ITS JUNCTION WITH TAI WAI ROAD.

THE MEASURE AIMS AT REGULATING THE ACTIVITES ON THAT SECTION OF TSUEN NAM ROAD.

LOADING AND UNLOADING

Share This Page