MONDAY, APRIL 4, 1988

OPENING OF SEAFRONT ROAD EASTBOUND

SEAFRONT ROAD BASTBOUND ROAD, WAN CHAI, WILL BE OPEN (APRIL 7).

BETWEEN

AND

FLEMING

THURSDAY

STREET FENWICK ΤΟ TRAFFIC FROM 10 AM ON

SEAFRONT

AT THE SAME TIME, VEHICLES TRAVELLING EASTWARDS ALONG ROAD WILL BE BANNED FROM TURNING INTO TONNOCHY ROAD SOUTHBOUND.

WAN CHAI NORTH HEADING SEAFRONT ROAD, HUNG

VEHICLES FROM FENWICK PIER STREET IN FOR CAUSEWAY BAY AND NORTH POINT CAN TRAVEL VIA HING ROAD FLYOVER TO JOIN VICTORIA PARK ROAD.

TRAFFIC CHANGES IN SHEK WAI KOK

SPECIAL TRAFFIC AND TRANSPORT ARRANGEMENTS WILL BE IMPLEMENTED

IN SHEK WAI KOK, TSUEN WAN, FROM 7 AM ON SATURDAY (APRIL 9).

THESE ARRANGEMENTS WILL FACILITATE THE CONSTRUCTION OF A ROAD AND VEHICULAR UNDERPASS BETWEEN WAL TSUEN ROAD AND SHEK WAI KOK THE IMPROVEMENT WORK TO SHEK WAI KOK ROAD IN CONNECTION WITH THE ROUTE 6 PROJECT.

THE ARRANGEMENTS WILL BE IN FORCE FOR ABOUT 12 MONTHS. UNDER

NUMBER THEM, A

OF ROAD SECTIONS WILL BE CLOSED,

OR RE-ROUTED, DESIGNATED AS URBAN CLEARWAYS.

OPERATIONS OF BUS AND GREEN MINIBUS ROUTES WILL ALSO BE AFFECTED WITH CHANGES IN TERMINI AND ROUTINGS.

SHEK WAI KOK ROAD BETWEEN THE ESTATE ROAD AND TEXACO ROAD NORTH, AND THE VEHICULAR UNDERPASS LEADING FROM TEXACO ROAD TO NORTHBOUND SHEK WAI KOK ROAD WILL BE CLOSED TO TRAFFIC.

NORTH

ON

TRAFFIC

TEXACO ROAD NORTH BETWEEN TSUEN KAM INTERCHANGE AND SHING MUN ROAD WILL BE PARTIALLY CLOSED, WITH TWO-WAY

MAINTAINED, FOR

ABOUT ONE MONTH.

ROAD NORTH WILL BE

TEXACO AFTER ONE MONTH, THIS SECTION OF COMPLETELY CLOSED, WHILE AT THE SAME TIME, WAI TSUEN ROAD BETWEEN TSUEN KAM INTERCHANGE AND MIU KONG STREET, CURRENTLY CLOSED) FOR ROAD WIDENING WORK, WILL BE RE-OPENED TO TRAFFIC.

/SHEK WAI

Share This Page