1988

MONDAY, MARCH 7, 1988

9

PILING CONTRACT FOR CHEUNG CHAU MARKET COMPLEX

AWARDED A CONTRACT CHAU MARKET

THE ARCHITECTURAL SERVICES DEPARTMENT HAS FOR THE DESIGN AND CONSTRUCTION OF PILING FOR THE CHEUNG COMPLEX.

METRE

WORK ΤΟ THE CHEUNG CHAU

WORTH $6.4 MILLION, THE CONTRACT CALLS FOR FOUNDATION

SITE NEAR BE CARRIED OUT ON A 3,600 SQUARE FERRY PIER, IN TAI HING TAI ROAD.

WORK WILL START THIS MONTH AND TAKE SIX MONTHS TO COMPLETE.

TENDERS FOR THE CONTRACT TO

BUILD THE MARKET

WILL BE INVITED IN MID-JUNE.

CONTRACT LET FOR LAND DEVELOPMENT

SUPERSTRUCTURE

A CONTRACT HAS

BEEN

AWARDED

BY THE

DEVELOPMENT BUILDING

TERRITORY DEPARTMENT FOR LAND DEVELOPMENT WORKS IN CONNECTION WITH THE OF FANLING/SHEK WU HUI NEW TOWN.

FANLING AREA 3,

INCLUDE SITE

THE WORKS CONSTRUCTION OF A FLOOD STORAGE POND, A LOCAL DISTRIBUTOR

CARPARKS, BETWEEN JOCKEY CLUB ROAD AND ROAD STORMWATER AND SEWAGE WORKS.

FORMATION

IN

L6,

ACCESS

ROAD (L6A)

AND ROADS,

THESE WORKS WILL SERVE THE FUTURE VILLAGE-TYPE

THE AREA.

WORK, COSTING ABOUT $34 MILLION, MONTH AND TAKE 18 MONTHS TO COMPLETE.

DEVELOPMENT IN

IS

то EXPECTED

BEGIN

THIS

EARTH DUMP OPENING HOURS CHANGED

THE PUBLIC EARTH DUMP AT ALDRICH BAY, SAI WAN HO, WILL UNDER NEW HOURS FROM TODAY (MONDAY 7).

OPERATE

THE OPENING HOURS ARE CHANGED FROM 8 AM

-

6 PM

ΤΟ

8.30

AM

6 PM ON WEEKDAYS.

THE DUMP WILL BE CLOSED ON SUNDAYS AND PUBLIC HOLIDAYS OR A TYPHOON SIGNAL IS HOISTED.

WHEN

OBTAINED BY APPLYING A DUMPING PERMIT IS REQUIRED AND CAN BE

OFFICE, CIVIL ENGINEERING TO PORT WORKS DIVISION, CIVIL ENGINEERING SERVICES DEPARTMENT, ON THE EIGHTH FLOOR, EMPIRE CENTRE, 68 MODY ROAD, TSIM SHA TSU) EAST.

/10

Page 10Page 11

Share This Page