20

TUESDAY, NOVEMBER 3, 1987

WONG ΤΑΙ IN ADDITION, THE SPEED LIMIT ON TWO ROAD SECTIONS IN

FOR ABOUT 18 MONTHS. SIN WILL BE REDUCED TO 50 KILOMETRES PER HOUR THEY ARE:

A POINT

THE EASTBOUND CARRIAGEWAY OF LUNG CHEUNG ROAD FROM ABOUT 25 METRES EAST OF ITS JUNCTION WITH THE SLIP ROAD LEADING TO LION ROCK TUNNEL ROAD TO A POINT ABOUT 600 METRES EAST OF THE SAME JUNCTION; AND

50

THE SECTION OF THE SLIP ROAD LEADING FROM LION ROCK TUNNEL ROAD TO LUNG CHEUNG ROAD EASTBOUND BETWEEN A POINT ABOUT

WITH METRES SOUTH OF ITS JUNCTION

LION ROCK TUNNEL AND ITS JUNCTION WITH LUNG CHEUNG ROAD EASTBOUND.

ROAD

TURNING MOVEMENT BANNED ON CASTLE PEAK ROAD

'A

NORTHBOUND TURN LEFT OR

FROM 10 AM ON FRIDAY (NOVEMBER 6), VEHICLES ON BOTH AND SOUTHBOUND CASTLE PEAK ROAD WILL NOT BE ALLOWED TO RIGHT ON TO TSING LUN ROAD IN TUEN MUN.

FRANCHISED BUSES, HOWEVER, ARE NOT SUBJECT TO THIS RESTRICTION.

THE MEASURE WILL BE IN FORCE FOR ABOUT 11 WEEKS CONSTRUCTION WORK ON THE LIGHT RAIL TRANSIT SYSTEM.

ΤΟ FACILITATE

E

AFFECTED VEHICLES WILL HAVE TO TRAVEL, VIA ROAD AND TSING CHUNG KOON ROAD.

ROAD

P2,

TSUN 5 WEN

JA

PARTIAL CLOSURE OF TUEN MUN ROAD

BRIDGE WILL BE

PARTIALLY

ROAD AT SO KWUN WAT THE SOUTHBOUND CARRIAGEWAY OF TUEN MUN

CLOSED FROM THURSDAY (NOVEMBER WOVEMBER 30 TO FACILITATE ROAD RE-SURFACING WORKS.

ot

TO

T

R

IN

R

BE CLOSED

THE THREE TRAFFIC LANES ON THE CARRIAGEWAY WILL TURN DAILY AND AT LEAST ONE OF THEM WILL BE KEPT OPEN DURING THE ROAD WORKS.

1

F

Share This Page