WEDNESDAY, SEPTEMBER 2, 1987
15
TRAFFIC ARRANGEMENTS IN SHAM SHUI PO
THE TRAFFIC DIRECTION OF THE U-SHAPED SECTION OF CHEUNG FAT STREET WILL BE REVERSED FOR ABOUT THREE MONTHS FOR ROAD RECONSTRUCTION FROM 10 AM TOMORROW (THURSDAY).
TRAFFIC ON UN CHAU STREET HEADING FOR UN CHAU STREET ESTATE WILL HAVE TO TURN LEFT AT THE TEMPORARY ENTRANCE IN THE NORTHERN JUNCTION OF UN CHAU STREET AND CHEUNG FAT STREET.
MEANWHILE, THE U-SHAPED SECTION OF CHEUNG FAT STREET ABOUT 50 METRES FROM ITS NORTHERN JUNCTION WITH UN CHAU STREET WILL BE DESIGNATED A PUBLIC LIGHT BUS RESTRICTED ZONE FROM 7 AM TO 10 AM AND FROM 4 PM TO 7 PM DAILY.
NO PLB WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS THERE.
NO LEFT TURN ON TAI YUK ROAD
NO VEHICLE WILL BE ALLOWED TO TURN LEFT FROM ΤΑΙ YUK ROAD NORTHBOUND ON TO CASTLE PEAK ROAD WESTBOUND FOR THE CONSTRUCTION OF THE LIGHT RAIL TRANSIT SYSTEM FROM 10 AM TOMORROW (THURSDAY).
MOTORISTS FROM YUEN LONG TOWN SOUTH HEADING FOR CASTLE ROAD WESTBOUND ARE ADVISED TO USE TAI YUK ROAD, MA MIU ROAD, MA ROAD, CASTLE PEAK ROAD/KAU YUK ROAD, FUNG NIN ROAD AND CASTLE ROAD.
THE MEASURE WILL BE IMPLEMENTED FOR ABOUT 20 DAYS.
PEAK WANG
PEAK
TRAFFIC CHANGES IN SHEUNG WAN
STREET TO FACILITATE ROAD RECONSTRUCTION WORK AT UPPER STATION
EXCEEDING 4.6 METRES IN VEHICLES
LENGTH WILL IN SHEUNG WAN, ALL
THE SECTION OF TAI PING SHAN CONTINUE TO BE BANNED FROM ENTERING
THREE STREET BETWEEN TUNG STREET AND UPPER STATION STREET FOR ANOTHER WEEKS FROM 10 AM ON SATURDAY (SEPTEMBER 5).
AT THE SAME TIME, SQUARE STREET WILL BE RE-ROUTED INTO
TWO-WAY
TRAFFIC.