FRIDAY, MAY 15, 1987

12

PLAN TO RESUME HAVEN STREET FOR REPAIR

*****

THE HIGHWAYS DEPARTMENT PROPOSES TO RESUME HAVEN STREET IN CAUSEWAY BAY SO THAT THE ROAD AND DRAINS CAN BE REPAIRED AND MAINTAINED TO A PROPER STANDARD.

THE PROPOSED WORK INVOLVES REPAIRING THE DEFECTIVE CARRIAGEWAY, FOOTPATH AND DRAINS WITHIN THE PRIVATE STREET.

THE WIDTH OF THE CARRIAGEWAY WILL BE REDUCED FROM NINE METRES TO 7.3 METRES, WHILE THE WIDTH OF THE FOOTWAY ON EACH SIDE OF THE STREET WILL BE INCREASED FROM 1.5 METRES TO 2.35 METRES.

HAVEN STREET IS NOW UNDER PRIVATE MULTIPLE OWNERSHIP AND IS NOT PROPERLY MANAGED AND MAINTAINED, A SITUATION WHICH HAS CAUSED CONSIDERABLE ENVIRONMENTAL AND TRAFFIC PROBLEMS.

WRITTEN OBJECTIONS TO THE PROPOSED WORK SHOULD BE SENT IN WRITING TO THE SECRETARY FOR TRANSPORT BY JULY 14.

TEMPORARY ROAD CLOSURE IN WAN CHAI

*****

PART OF ARSENAL STREET IN WAN CHAI WILL BE CLOSED TO TRAFFIC NEXT WEEK FOR ROAD WORKS.

THE NORTHBOUND SECTION OF ARSENAL STREET BETWEEN LOCKHART ROAD AND INNER GLOUCESTER ROAD WILL BE CLOSED TO TRAFFIC DAILY FROM 9.30 PM UNTIL 6 AM THE FOLLOWING MORNING ON MONDAY (MAY 18) AND TUESDAY (MAY 19).

VEHICLES HEADING FOR CENTRAL WILL BE DIVERTED TO LOCK HART ROAD, FENWICK STREET AND INNER GLOUCESTER ROAD.

IN ADDITION, FROM 9 PM ON WEDNESDAY (MAY 20) TO 6 AM THE FOLLOWING DAY, THE SOUTHBOUND LANE OF ARSENAL STREET BETWEEN LOCK HART ROAD AND INNER GLOUCESTER ROAD WILL BE CLOSED. VEHICLES ON INNER GLOUCESTER ROAD WILL HAVE TO USE FENWICK STREET TO REJOIN LOCK HART ROAD.

THE SAME MEASURE WILL BE IN FORCE AGAIN BETWEEN 9 PM ON THURSDAY (MAY 21) AND 6 AM THE FOLLOWING MORNING.

J

t

Share This Page