SATURDAY, FEBRUARY 21, 1987
13
IN ADDITION, A TEMPORARY CAR PARK WILL BE BUILT TO REPLACE ON-STREET CAR PARKING BAYS ALONG SHA TAU KOK ROAD AFFECTED BY THE PROJECT.
MEASURES WILL BE TAKEN TO MINIMISE DISTURBANCE TO MOTORISTS AND PEDESTRIANS.
WORK HAS STARTED AND WILL BE COMPLETED IN 15 MONTHS.
PRINCESS MARGARET ROAD, WATERLOO ROAD TRAFFIC CHANGES *****
SPECIAL TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN PRINCESS MARGARET ROAD AND WATERLOO ROAD FROM TUESDAY (FEBRUARY 24) TO FEBRUARY 26 BETWEEN 10 PM AND 6 AM THE FOLLOWING DAY TO ENABLE BEAMS AT THE EASTERN SIDE OF THE PRINCESS MARGARET ROAD FLYOVER NEAR PERTH STREET TO BE REMOVED.
PRINCESS MARGARET ROAD SOUTHBOUND BETWEEN ARGYLE STREET AND THE DOWN-RAMP OF THE FLYOVER WILL BE CLOSED TO TRAFFIC, EXCEPT THOSE WISHING TO GAIN ACCESS TO DUNBAR ROAD AND PERTH STREET.
THE EXISTING BUS-ONLY LANE ON THE OUTERMOST TRAFFIC LANE OF WATERLOO ROAD SOUTHBOUND BENEATH THE FLYOVER WILL BE WITHDRAWN TEMPORARILY.
VEHICLES TRAVELLING ON SOUTHBOUND WATERLOO ROAD AND ARGYLE STREET WESTBOUND HEADING FOR PRINCESS MARGARET ROAD SOUTHBOUND WILL BE DIVERTED TO WATERLOO ROAD, PUI CHING ROAD AND SHEUNG HING STREET TO REJOIN PRINCESS MARGARET ROAD.
KMB ROUTE 7B ON ITS JOURNEY TO HUNG HOM FERRY WILL BE DIVERTED TO WATERLOO ROAD, PUI CHING ROAD AND FAT KWONG STREET INSTEAD OF PRINCESS MARGARET ROAD, SHEUNG HING STREET AND FAT KWONG STREET BEFORE RESUMING NORMAL ROJTINGS.
RESTRICTED ZONES SET UP IN HUNG HOM *****
TWO SECTIONS OF WINSLOW STREET IN HUNG HOM WILL BE DESIGNATED RESTRICTED ZONES FROM 7 AM TO 10 AM AND FROM 4 PM TO 7 PM STARTING 10 AM ON TUESDAY (FEBRUARY 24).
THEY ARE THE SOUTHERN SIDE BETWEEN WINSLOW STREET UNDERPASS AND LO LUNG HANG STREET AND THE NORTHERN SIDE BETWEEN CHATHAM ROAD AND LO LUNG HANG STREET.
NO VEHICLE WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS IN THE TWO AREAS.