H
16
SATURDAY, OCTOBER 11, 1986
TRAFFIC ARRANGEMENTS IN CAUSEWAY BAY
*****
THE APPROACH ROAD LEADING FROM GLOUCESTER ROAD TO CROSS HARBOUR TUNNEL WILL BE TEMPORARILY CLOSED TO TRAFFIC DAILY BETWEEN 12.30 AM AND 6 AM FROM OCTOBER 14 (TUESDAY) TO OCTOBER 17 FOR THE REMOVAL OF FALSEWORK FOR A FLYOVER.
DURING THE CLOSURE, VEHICLES ON GLOUCESTER ROAD WILL BE DIVERTED TO CANAL ROAD FLYOVER INTERCHANGE, CANAL ROAD EAST, CANAL ROAD WEST AND CANAL ROAD FLYOVER TO CROSS HARBOUR TUNNEL.
IN CONNECTION WITH THE CLOSURE, TWO BUS-ONLY LANES IN THE AREA WILL BE LIFTED TEMPORARILY DURING THE SAME PERIOD.
THEY ARE:
*
THE BUS-ONLY LANE ON THE MIDDLE LANE OF THE SOUTHERN APPROACH ROAD OF THE CROSS HARBOUR TUNNEL INTERCHANGE FROM THE JUNCTION OF THE ROAD LEADING TO NORTH POINT AND THE ROAD LEADING TO CROSS HARBOUR TUNNEL TO A POINT ABOUT 20 METRES SOUTH OF THE SAME JUNCTION,
* THE BUS-ONLY LANE ON CANAL ROAD EAST FROM ITS JUNCTION WITH CANAL ROAD WEST TO A POINT ABOUT 120 METRES NORTH OF THE SAME JUNCTION.