FRIDAY, SEPTEMBER 26, 1986
11
RESURFACING WORK ON LION ROCK TUNNEL ROAD
**** *
TO FACILITATE RESURFACING WORK, TRAFFIC LANES ON THE NORTHBOUND CARRIAGEWAY OF LION ROCK TUNNEL ROAD WILL BE CLOSED SEPARATELY FROM SEPTEMBER 30 (TUESDAY) TO OCTOBER 3 DAILY BETWEEN 8 PM AND 6 AM THE FOLLOWING DAY.
THE SECTION AFFECTED RUNS FROM THE TOLL PLAZA TO A POINT ABOUT 500 METRES NORTH OF THE ROAD'S JUNCTION WITH HUNG MUT KUK ROAD.
MOTORISTS SHOULD DRIVE WITH CARE AS SOME CONGESTION IS
EXPECTED.
HUNG HOM FLYOVER CLOSED FOR RESURFACING
*****
BECAUSE ROAD RESURFACING WORK WILL BE IN PROGRESS, THE WESTBOUND CARRIAGEWAY OF CHEONG WAN ROAD FLYOVER IN HUNG HOM, LEADING FROM THE KOWLOON KCR STATION PODIUM TO CHEONG WAN ROAD AND CHATHAM ROAD SOUTH, WILL BE CLOSED FROM 1 AM TO 6 AM ON SEPTEMBER 29 (MONDAY) AND SEPTEMBER 30.
MOTORISTS ON THE KOWLOON KCR STATION PODIUM HEADING FOR CHEONG WAN ROAD AND CHATHAM ROAD SOUTH ARE ADVISED TO USE ON WAN ROAD, CHEONG WAN ROAD, GILLIES AVENUE, WUHU STREET, CHATHAM ROAD NORTH AND CHATHAM ROAD SOUTH.
CLEAR WATER BAY ROAD BAN LIFTED
****
THE GOODS VEHICLE PROHIBITION IMPOSED ON TWO SECTIONS OF CLEAR WATER BAY ROAD ON SUNDAYS AND PUBLIC HOLIDAYS WILL BE LIFTED FROM 10 AM ON MONDAY (SEPTEMBER 29).
THE SECTIONS ARE THE EASTBOUND AND WESTBOUND CARRIAGEWAYS OF CLEAR WATER BAY ROAD BETWEEN ANDERSON ROAD AND A POINT ABOUT 200 METRES WEST OF ITS JUNCTION WITH HIRAM'S HIGHWAYS.
-
HEAVY VEHICLES BANNED IN WAN CHAI STREET
****
FROM 10 AM ON MONDAY (SEPTEMBER 29), NO VEHICLE EXCEEDING FOUR TONNES GROSS WILL BE ALLOWED TO ENTER THE SECTION OF TAI YUEN STREET BETWEEN QUEEN'S ROAD EAST AND CROSS STREET, WAN CHAI.
THE MEASURE WILL BE IN FORCE FOR ABOUT THREE MONTHS BECAUSE OF ROAD RECONSTRUCTION WORK.