MONDAY, JUNE 2, 1986
OCCUPATION PERMITS WERE ISSUED FOR A TOTAL OF 21 BUILDINGS, OF WHICH 11 WERE ON HONG KONG ISLAND, FOUR IN KOWLOON AND SIX IN THE NEW TERRITORIES.
THEY INCLUDED 22 RESIDENCES IN PLANTATION, SEVERN AND MOUNT AUSTIN ROADS ON HONG KONG ISLAND: A SEVEN-STOREY EXTENSION TO. ST PAUL'S CO-EDUCATIONAL COLLEGE IN MACDONNELL ROAD; AND A COMMERCIAL AND 867-ROOM HOTEL DEVELOPMENT, EACH OF 40 STOREYS, IN CONNAUGHT ROAD CENTRAL.
THERE WERE ALSO SIX 31- AND 32-STOREY APARTMENT BLOCKS IN THE FIRST PHASE OF THE KORNHILL DEVELOPMENT; A DEPOT FOR THE MASS TRANSIT RAILWAY CORPORATION AT LEI YUE MUN: THREE WORKSHOPS IN KOWLOON BAY AND A FURTHER WORKSHOP IN FO TAN; AND A 753-ROOM HOTEL IN SHA TIN.
IN APRIL THE TOTAL FLOOR AREA OF BUILDINGS COMPLETED WAS 279 487.3 SQUARE METRES VALUED AT APPROXIMATELY $1 849 MILLION.
IN THE SAME MONTH, THE B.0.0. GAVE CONSENT FOR 38 BUILDINGS TO BE DEMOLISHED.
ALLOCATION OF PRIMARY ONE PLACES OUT ON SATURDAY
*******
RESULTS OF THE CENTRAL ALLOCATION OF PRIMARY ONE PLACES FOR SEPTEMBER THIS YEAR, UNDER THE PRIMARY ONE ADMISSION SYSTEM, WILL BE ANNOUNCED ON SATURDAY (JUNE 7).
OF 34 653 CHILDREN TAKING PART IN THE CENTRAL ALLOCATION, 22 330, REPRESENTING 64.5 PER CENT, HAVE BEEN ALLOCATED TO SCHOOLS OF THE IR PARENTS' FIRST THREE CHOICES, A SPOKESMAN FOR THE EDUCATION DEPARTMENT SAID.
PARENTS ARE REQUESTED TO GO BACK TO THE DISTRIBUTION- COLLECTION CENTRE IN THEIR OWN DISTRICT ON SATURDAY (JUNE 7) OR SUNDAY (JUNE 8) BETWEEN 9 AM AND 4 PM TO COLLECT AN ALLOCATION SLIP.
THE SLIP CONTAINS THE NAME AND ADDRESS OF THE SCHOOL TO WHICH THEIR CHILD HAS BEEN ALLOCATED, TOGETHER WITH THE DATES AND DETAILS FOR REGISTRATION,
PARENTS ARE REQUESTED TO BRING THEIR CHILD TO THE SCHOOL TO COMPLETE REGISTRATION FORMALITIES ON JUNE 12 OR 13.
THE REGISTRATION HOURS FOR AM SCHOOLS WILL BE FROM 9 AM TO NOON AND FROM 2 PM TO 5 PM FOR PM SCHOOLS,
/FOR WHOLE-DAY