TUESDAY, MARCH 25, 1986
24
DETAILS OF LAND DEVELOPMENT CORPORATION
*****
THE DIRECTOR OF LANDS, MR JOHN TODD, WILL ANNOUNCE DETAILS OF THE FORMATION OF THE LAND DEVELOPMENT CORPORATION AT A PRESS CONFERENCE TOMORROW (WEDNESDAY) MORNING.
IT WILL BE HELD AT THE GIS PRESS CONFERENCE ROOM, FIFTH FLOOR, BEACONSFIELD HOUSE, AT 11 AM.
NOTE TO EDITORS:
YOU ARE INVITED TO ATTEND.
CENTRAL, WESTERN TRAFFIC CHANGES
*****
A NUMBER OF TEMPORARY TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN CENTRAL TO FACILITATE ROAD WORKS:
* FROM 8 AM ON FRIDAY (MARCH 28), VEHICLES EXCEEDING 5.5 TONNES GROSS ON QUEEN'S ROAD CENTRAL WILL NOT BE ALLOWED TO ENTER MORRISON STREET FOR ABOUT FOUR DAYS. AFFECTED VEHICLES WILL BE DIVERTED TO QUEEN'S ROAD CENTRAL AND JERVOIS STREET TO REJOIN MORRISON STREET.
* THE SLIP ROAD FROM COTTON TREE DRIVE TO GARDEN ROAD WILL BE CLOSED TO TRAFFIC BETWEEN 7 PM ON THURSDAY (MARCH 27) AND 6 AM THE NEXT MORNING. AFFECTED VEHICLES WILL BE DIVERTED TO KENNEDY ROAD TO REJOIN GARDEN ROAD. THE MEASURE WILL BE REPEATED DAILY FROM 7 PM TO 6 AM THE FOLLOWING DAY ON MARCH 28 AND MARCH 30.
* VEHICLES EXCEEDING 5.5 TONNES GROSS ON GARDEN ROAD WILL BE BANNED FROM ENTERING LOWER ALBERT ROAD BETWEEN 10 PM ON MONDAY (MARCH 31) AND 6 AM THE NEXT MORNING. AFFECTED VEHICLES WILL HAVE TO TRAVEL VIA UPPER ALBERT ROAD, ARBUTHNOT ROAD AND WYNDHAM STREET TO REJOIN LOWER ALBERT ROAD. THE RESTRICTION WILL BE IN FORCE AGAIN DAILY BETWEEN 10 PM AND
6 AM THE FOLLOWING DAY ON APRIL 1 AND APRIL 2.
* THE SLIP ROAD FROM GARDEN ROAD TO COTTON TREE DRIVE WILL BE CLOSED TO TRAFFIC BETWEEN 8 PM ON APRIL 3 AND 6 AM THE NEXT MORNING. AFFECTED VEHICLES WILL HAVE TO USE THE SLIP ROAD ADJOINING THE PEAK TRAM TERMINUS TO REJOIN COTTON TREE DRIVE.
/IN ADDITION,
LH