FRIDAY, DECEMBER 27, 1985
10
THE FOURTH SITE IS AT TAI LIN PAI ROAD, KWAI CHUNG, AND NOT LESS THAN 9 519 SQUARE METRES OF ITS GROSS FLOOR AREA HAVE TO BE COMPLETED BEFORE MARCH 31, 1990.
FULL PARTICULARS AND CONDITIONS OF SALE MAY BE OBTAINED FROM, AND SALE PLANS INSPECTED AT, THE LANDS DEPARTMENT, SURVEY DIVISIO MURRAY BUILDING, FIFTH FLOOR, GARDEN ROAD, HONG KONG, THE PUBLIC ENQUIRY SUB-OFFICE, CENTRAL GOVERNMENT OFFICES (WEST WING), GROUND FLOOR, HONG KONG AND THE DISTRICT LANDS OFFICES, KOWLOON, YAU MA TEI CAR PARK BUILDING, 10TH FLOOR, 250 SHANGHAI STREET, KOWLOON.
CONDITIONS OF SALE MAY ALSO BE AVAILABLE AT THE DISTRICT LANDS OFFICES OF SHA TIN, TUEN MUN, YUEN LONG, TSUEN WAN, TA! PO, NORTH, SAI KUNG AND ISLANDS.
PREQUALIFICATION CALLED FOR MAJOR ROAD WORKS
*****
THE ENGINEERING DEVELOPMENT DEPARTMENT IS INVITING CONTRACTORS TO APPLY FOR INCLUSION ONTO A LIST OF PREQUALIFIED CONTRACTORS TJ CARRY OUT CONSTRUCTION OF TWO FLYOVERS AND AN UNDERPASS IN CENTRAL.
THE FIRST PROJECT INVOLVES THE CONSTRUCTION OF A 260-METRE FLYOVER ALONG HARCOURT ROAD TO ITS JUNCTION WITH COTTON TREE DRIVE, A DUAL TWO-LANE UNDERPASS MEASURING 280 METRES LONG ALONG CONNAUGHT ROAD AT PEDDER STREET, AND A FOOTBRIDGE ACROSS CONNAUGHT ROAD AT
AND POTTINGER STREET, AN EXTENSION OF THE STAR FERRY SUBWAY, MODIFICATION TO THE EXISTING GROUND-LEVEL ROADS.
WORK ON THE SECOND PROJECT WILL INCLUDE THE CONSTRUCTION OF A DUAL THREE-LANE FLYOVER ALONG CONNAUGHT ROAD BETWEEN SUTHERLAND STREET AND GILMAN STREET, AND TWO FOOTBRIDGES ACROSS CONNAUGHT ROAD AT MORRISON STREET AND TUNG HING LANE.
IT IS EXPECTED THAT WORK ON THE PROJECTS, PART OF THE UPGRADED CONNAUGHT ROAD SCHEME, WILL START IN THE THIRD QUARTER OF 1986 AND BE COMPLETED BY 1989.
ONLY CONTRACTORS FROM THE APPROVED CONTRACTORS FOR PUBLIC WORKS: BUILDING, CIVIL ENGINEERING AND WATER WORKS LIST I IN GROUP C AND LIST 11 FOR ROADS AND DRAINAGE WORKS WHO HAVE A PROVEN RECORD OF SUCCESSFUL COMPLETION OF MAJOR CONCRETE HIGHWAY STRUCTURES WILL BE ELIGIBLE FOR PREQUALIFICATION.
FURTHER INFORMATION ON THE REQUIREMENTS FOR PREQUALIFICATION MAY BE OBTAINED FROM MESSRS. PETER Y.S. PUN AND ASSOCIATES. FIRST FLOOR, LOCKHART CENTRE, 301-307 LOCKHART ROAD, WAN CHAI, HONG KONG.
APPLICATIONS MUST BE ADDRESSED TO THE CHAIRMAN, CENTRAL TENDER BOARD, AND PLACED IN THE GOVERNMENT SECRETARIAT TENDER BOX AT THE LIFT LOBBY ON THE LOWER GROUND FLOOR OF THE CENTRAL GOVERNMENT OFFICES, EAST WING, LOWER ALBERT ROAD, HONG KONG BEFORE NOON ON JANUARY 24.
/11