FR

„EMBER 12, 1vân

THE BUILDING COVENANT REQUIRES THE DEVELOPER TO COMPLETE NOT LESS THAN 29 230 SQUARE METRES OF GROSS FLOOR AREA ON THE 4 200-SQUARE-METRE SITE BEFORE MARCH 31, 1990.

TWO LOTS ARE AT CASTLE PEAK ROAD, YUEN LONG 1 971 AND THE OTHER 2 242 SQUARE METRÉS.

-

ONE MEASURING

THE SMALLER SITE, FACING SHUI PIN WAI ESTATE, IS FOR PETROL FILLING STATION, EXCLUDING ANY LUBRICATING OR SERVICING FACILITIES. THE OTHER ONE IS NEAR FUI SHA WAI AN IS FOR THE SAME USE, BUT INCLUDING LUBRICATING AND SERVICING FACILITIES.

BOTH STATIONS HAVE TO BE READY FOR OPERATION BY MARCH 31, 1988.

IT MEASURES ABOUT THE LAST LOT IS AT YIM TIN TSAI, TAI PO. 670.1 SQUARE METRES AND IS FOR A MARINE PETROL FILLING STATION.

THE BUYER IS REQUIRED TO COMPLETE THE STATION AND MAKE IT FIT FOR OPERATION WITHIN 24 MONTHS FROM THE DATE OF AGREEMENT.

CLOSING DATE FOR ACCEPTANCE OF TENDER OF THESE SITES IS NOON ON JANUARY 10, 1986.

FORM OF TENDER, TENDER NOTICE AND CONDITIONS MAY BE OBTAINED FROM, AND TENDER PLAN INSPECTED AT, THE LANDS DEPARTMENT, SURVEY DIVISIÓN, MURRAY BUILDING, 5TH FLOOR, GARDEN ROAD, HONG

YAU MA TEI CAR KONG, AND THE DISTRICT LANDS OFFICE, KOWLOON.

PARK BUILDING, 10TH FLOOR, 250 SHANGHA+ STREET, KOWLOON.

TENDER DOCUMENTS MAY ALSO BE OBTAINED FROM THE DISTRICT LANDS OFFICE OF SHA TIN, TAI PO, NORTH, YUEN LONG, TSUEN WAN, TUEN MUN, SAI KUNG AND ISLANDS.

STARRY NIGHT FOR KWUN TONG

***

A 40-METRE GOLDEN DRAGON, TWO CHINESE LIONS, AND AN ALL- STAR VARIETY SHOW WILL START OFF THE THREE-WEEK KWUN TONG FESTIVAL '85 TOMORROW (SATURDAY) EVENING.

+THE DRAGON AND LION DANCES SYMBOLISES GOOD LUCK FOR RESIDENTS, AND THE VARIETY SHOW PROMISES A NIGHT OF ENTERTAINMENT FOR THE OPENING OF THE FESTIVAL, A SPOKESMAN FOR THE ORGANISING COMMITTEE SAID.

+DURING THE VARIETY SHOW, ARTISTS AND SINGERS FROM ASIA TELEVISION WILL DRAMATISE THE VARIOUS FEATURES OF KWUN TONG THROUGH CHARACTER PERFORMANCES AND SONGS.

/+THE KWUN

Share This Page