SATURDAY, NOVEMBER 23, 1985
16
TRAFFIC CHANGES IN WAN CHAI
***
THE JUNCTION OF WAN CHAI ROAD (WESTBOUND) AND TAK YAN STREET WILL BE CLOSED TO TRAFFIC FROM 10 AM ON MONDAY (NOVEMBER 25) TO 5 PM ON NOVEMBER 27 FOR ROAD WORK.
DURING THE CLOSURE, VEHICLES ON WAN CHAI ROAD WESTBOUND HEADING FOR 01 KWAN ROAD WILL BE DIVERTED VIA WOOD ROAD AND WING CHEUNG STREET.
IN ADDITION, 01 KWAN ROAD IN WAN CHAI WILL BE REROUTED ONE-WAY CLOCKWISE FROM 12.30 PM TO 4.30 PM ON TUESDAY (NOVEMBER 26) FOR THE 5TH COMMUNITY YOUTH CLUB ANNUAL PARADE AT QUEEN ELIZABETH STADIUM TO BE HELD.
THE METERED PARKING SPACES ON OF KWAN ROAD WILL BE SUSPENDED DURING THE PARADE.
CLOSURE OF SLIP ROAD PROPOSED
***
A TEMPORARY SLIP ROAD OFF KAI KUK ROAD TO SHEUNG YEE ROAD IS PROPOSED TO BE CLOSED TO FACILITATE THE CONSTRUCTION OF THE PERMANENT ROAD SYSTEM IN KOWLOON BAY.
THE PROPOSED CLOSURE, PUBLISHED IN THE LATEST GOVERNMENT GAZETTE, IS AN AMENDMENT TO THE ORIGINAL PLAN FOR THE CONSTRUCTION OF ROADS AND DRAINAGE IN KOWLOON BAY WHICH WAS FIRST GAZETTED IN OCTOBER 1983.
THE AMENDED PLAN AND SCHEME MAY BE INSPECTED AT THE CENTRAL AND WESTERN DISTRICT OFFICE, CENTRAL ENQUIRY SUB-OFFICE, CENTRAL GOVERNMENT OFFICES, WEST WING, MAIN ENTRANCE LOBBY, HONG KONG; THE DISTRICT LANDS OFF ICE, KOWLOON EAST, YAU MA TEI CARPARK BUILDING, 10TH FLOOR, 250 SHANGHAI STREET; AND THE KWUN TONG DISTRICT OFFICE, KWUN TONG DISTRICT BRANCH OFFICES BUILDING, TUNG YAN STREET, THIRD AND FOURTH FLOORS.
OBJECTIONS TO THE WORKS SHOULD BE SENT IN WRITING TO THE SECRETARY FOR LANDS AND WORKS NOT LATER THAN JANUARY 21, 1986.