- 5 -
PRESS CENTRE
For the omvenience of the media, a press centre will be set
up inside the Queen Elizabeth Stadium in Gymnasium II and half of the
adjacent lobby. The press centre will be one floor below the dounting
centre in the arena. ▲ floor plan of the press centre is at inner 7.
The press centre will come into operation from 7 an on
September 26 until all electim remlts are knom.
Six separate bootha for broadcasting will be provided inside
the Gym for use by the four radio channels and the two television
atations. Statims requiring additional communications equipment can
have them installed after 10 am on September 25. All equipment mist
be removed before 3 pm on September 27.
Parking spaces inside the Stadium and on the opposite side of
01 Kwan Road have been reserved for outside broadcast vehicles.
A working area with typewriters, result forms, and stationery,
will be provided for media representatives both inside the Gym and in
the lobby. An area inside the Gym will be soremed off as a rest/
interview ZOCH, Television sets will be installed to nable journalista
to watch election-related programmes.
There will be eight wireless talephmes inside booths for use
by the press.
Refreshments (tea, coffee, soft drinks and sandwiches) will
be available throughout the day.
All preas
There will be a GIS deak in the press omtre for the collection
and dissemination of election news and other related storie
enquiries on the election should be directed to this GIS deak on that
day. Special telephone numbers for the desk are 5-7537 47, 5-754045,
04850744 and 04850746.
/Display boards...