17

THURSDAY, MAY 23, 1985

IN ADDITION, CMB ROUTE 2 AND ROUTE 82 WILL FINISH ABOUT 20 MINUTES AND AN HOUR EARLIER THAN USUAL RESPECTIVELY ON SATURDAY AND SUNDAY (MAY 25 AND 26) NIGHT.

IN NORTH POINT, KAM HONG STREET BETWEEN KING'S ROAD AND TSAT TSZ MU1 ROAD WILL BE REROUTED ONE-WAY SOUTHBOUND FROM SUNDAY (MAY 26) TO JUNE 1 DAILY FROM 10 PM TO 6 AM THE FOLLOWING DAY TO FACILITATE ROAD RESURFACING WORK.

ALL NORTHBOUND VEHICLES ON KAM HONG STREET SOUTH OF KING'S ROAD WILL BE DIVERTED VIA TANNER ROAD AND TIN CHIU STREET.

AND IN WESTERN DISTRICT, A COUPLE OF ROAD SECTIONS WILL BE CLOSED ON SUNDAY (MAY 26) AND JUNE 2 FOR FOOTBRIDGE CONSTRUCTION WORK NEAR THE UNIVERSITY OF HONG KONG.

POK FU LAM ROAD BETWEEN POKFIELD ROAD AND HILL ROAD WILL BE CLOSED TO TRAFFIC FROM 1.15 AM TO 2.15 AM ON THOSE DAYS. VEHICLES ON POK FU LAM ROAD EASTBOUND WILL BE DIVERTED VIA POKFIELD ROAD, WHILE WESTBOUND TRAFFIC ON POK FU LAM ROAD AND BONHAM ROAD WILL BE DIVERTED VIA HILL ROAD.

FROM 2.15 AM TO 5.30 AM, POK FU LAM ROAD BETWEEN HILL ROAD FLYOVER AND HILL ROAD WILL BE CLOSED TO TRAFFIC. VEHICLES ON POK FU LAM ROAD EASTBOUND WILL BE DIVERTED VIA HILL ROAD FLYOVER WHILE WESTBOUND TRAFFIC ON POK FU LAM ROAD AND BONHAM ROAD WILL BE DIVERTED VIA HILL ROAD.

TSING YI TRAFFIC CHANGES

****

FOR THREE ONE-HOUR PERIODS ON SUNDAY (MAY 26), TSING YI BRIDGE WILL BE OPEN TO TRAFFIC AT INTERVALS OF FIVE MINUTES ONLY, THESE ONE-HOUR PERIODS WILL START FROM 12 MIDNIGHT, 6.30 AM AND 3 PM.

WORK.

THIS IS TO ENABLE CONSULTANTS TO CARRY OUT INVESTIGATIVE

AND FROM MONDAY (MAY 27) TO SUNDAY (JUNE 2) ONE TRAFFIC LANE ON THE TSING YI ROUNDABOUT, NEAR TSING YI HEUNG SZE WUI ROAD, AND PART OF THE NEARBY EXIT OF TSING YI BRIDGE WILL BE CLOSED TO TRAFFIC BETWEEN 12.30 AM AND 5.30 AM, FOR ROAD WORKS.

/16

Share This Page