WEDNESDAY, MARCH 27, 1985
42
SHAU KEI WAN TRAFFIC ARRANGEMENTS
***
SPECIAL TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN SHAU KEI WAN TO FACILITATE WORK ON THE ISLAND EASTERN CORRIDOR.
FROM 1.15 AM TO 5.30 AM ON SATURDAY (MARCH 30) AND 1.15 AM TO 6.30 AM ON SUNDAY (MARCH 31), TRAFFIC ON SHAU KEI WAN ROAD EASTBOUND AND SHAU KEI WAN MAIN STREET EAST WESTBOUND NEAR CHAI WAN ROAD WILL BE REQUIRED TO STOP AT INTERVALS, EACH STOP WILL LAST FOR FIVE MINUTES AFTER WHICH TRAFFIC WILL BE ALLOWED TO PROCEED.
AS A RESULT OF THE ABOVE MEASURES, TRAM SERVICES IN SHAU KEI WAN WILL START LATER THAN USUAL ON SUNDAY (MARCH 31) MORNING. THE DETAILS ARE:
SERVICE
SHAU KEI WAN TO WESTERN MARKET
FIRST DEPARTURE
7.09 AM
SHAU KEI WAN TO HAPPY VALLEY
7.11 AM
WESTERN MARKET TO SHAU KEI WAN
6.25 AM
HAPPY VALLEY TO SHAU KE! WAN
6.38 AM
BEFORE THE ABOVE TIMES, TRAM SERVICES TO SHAU KEI WAN WILL BE CUT OFF AT SAI WAN HO.
SALT WATER CUTS ***
SALT WATER SUPPLY TO CERTAIN PREMISES IN KWUN TONG WILL BE SUSPENDED FROM 9 AM TO 5 PM ON SATURDAY (MARCH 30) FOR WATER MAINS WORK.
THE AFFECTED PREMISES ARE BOUNDED BY KUNG LOK ROAD, HONG LEE ROAD AND HONG NING ROAD FROM KUNG LOK ROAD TO HIP WO STREET,
INCLUDING LOK WAH ESTATE PHASE I, II AND II.
MEET THE MEDIA
***
THE DIRECTOR OF THE ENGINEERING DEVELOPMENT DEPARTMENT, DR K.F. NIP, AND THE PRINCIPAL GOVERNMENT HIGHWAY ENGINEER, MR H.C. BEATON, WILL MEET THE MEDIA TOMORROW (THURSDAY) AT
4 PM IN THE 61S PRESS CONFERENCE ROOM, FIFTH FLOOR, BEACONSFIELD HOUSE, CENTRAL.