MONDAY, NOVEMBER 19, 1984
13
FOOTBRIDGE IN KWAI CHUNG
***
A FOOTBRIDGE WILL BE BUILT ACROSS CASTLE PEAK ROAD NEAR CHUNG SHAN TERRACE IN KWAI CHUNG.
THE 21-METRE FOOTBRIDGE WILL HELP SEPARATE PEDESTRIANS FROM THE MAIN TRAFFIC TO ENSURE GREATER SAFETY.
WORK ON THE PROJECT WILL START EARLY NEXT WEEK, AND TAKE FIVE MONTHS TO COMPLETE.
TRAFFIC CHANGE
***
THE SOUTHERN JUNCTION OF ROAD 37A WITH CASTLE PEAK ROAD WILL BE CLOSED TO TRAFFIC FOR THREE WEEKS FROM 10 AM ON TUESDAY (NOVEMBER 20) FOR CONSTRUCTION WORK.
AT THE SAME TIME, ROAD 37B WILL BE PERMANENTLY REROUTED ONE-WAY.
TEMPORARY LANE CLOSURE
****
HING
THE SECTION OF WAN TSUI LANE NORTH OF SHUN HING HOUSE. WAH ESTATE, IN CHAI WAN WILL BE CLOSED TO TRAFFIC FROM 10 AM TO ABOUT 3 PM ON WEDNESDAY (NOVEMBER 21) FOR WORK ON THE MTR ISLAND LINE.
WATER FIGURES ***
STORAGE IN HONG KONG'S RESERVOIRS AT 9 AM TODAY (MONDAY)
STOOD AT 79.1 PER CENT OF CAPACITY OR 463.864 MILLION CUBIC METRES.
THIS TIME LAST YEAR THE RESERVOIRS CONTAINED 563.474 MILLION CUBIC METRES OF WATER, REPRESENTING 96.1 PER CENT OF CAPACITY.