FRIDAY, AUGUST 17, 1984
19
TRAFFIC MEASURES IN SHAU KEI WAN
****
THE FOLLOWING TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN SHAU KEI WAN ON SUNDAY (AUGUST 19) TO FACILITATE CONSTRUCTION OF A FOOTBRIDGE IN THE AREA:
* THE WESTBOUND CARRIAGEWAY OF SHAU KEI WAN ROAD
BETWEEN TAI KOO SHING ROAD AND TAI CHEONG STREET WILL BE CLOSED TO TRAFFIC FROM 1 AM TO 3 AM. TRAFFIC HEADING FOR NORTH POINT WILL BE DIVERTED VIA THE EASTBOUND CARRIAGEWAY WHICH WILL BE RE-ROUTED FOR TWO-WAY TRAFFIC.
* THE EASTBOUND CARRIAGEWAY OF SHAU KEI WAN ROAD
BETWEEN TAI KOO SHING ROAD AND TAI CHEONG STREET WILL BE CLOSED TO TRAFFIC FROM 3 AM TO 7 AM. TRAFFIC HEADING FOR CHAI WAN WILL BE DIVERTED VIA THE WESTBOUND CARRIAGEWAY WHICH WILL BE RE-ROUTED FOR TWO-WAY TRAFFIC.
THE
* TRAM SERVICES WILL START LATER THAN USUAL.
FIRST WESTBOUND TRAMS WILL LEAVE SHAU KEI WAN FOR WESTERN MARKET AT 7.12 AM, AND SHAU KEI WAN FOR HAPPY VALLEY AT 7.14 AM. THE FIRST EASTBOUND TRAMS WILL LEAVE WESTERN MARKET FOR SHAU KE1 WAN AT 6.30 AM, AND HAPPY VALLEY FOR SHAU KEI WAN AT 6.40 AM.
NEW MAXICAB SERVICES FOR TUEN MUN
****
NEW MAXICAB ROUTE NOS 45 AND 46 WILL BE INTRODUCED ON MONDAY (AUGUST 20) FOR TUEN MUN NEW TOWN.
NO. 45 WILL OPERATE FROM SHAN KING ESTATE TO THE TUEN MUN FERRY PIER VIA SHEK PA TAU ROAD, KIN WING STREET AND TUEN MUN HEUNG SZE WUI ROAD.
NO. 46 WILL RUN FROM AREA 4B TO THIS PIER VIA CASTLE PEAK ROAD, ROAD D8 AND TUEN MUN HEUNG SZE WUI ROAD.
THE FARE FOR EITHER ROUTE IS $1.50.
/20
Page 20Page 21