MONDAY, JULY 2, 1984

12

+AS THE WEATHER IS GETTING MORE HUMID THESE DAYS, CONTRACTORS OF BUILDING SITES ARE ESPECIALLY REMINDED OF THE NEED TO ENSURE

HAT NO STAGNANT WATER IS ACCUMULATED IN THE WORK AREAS.

+ THEY SHOULD INSTRUCT SITE WORKERS TO SPRAY AT LEAST ONCE A WEEK A LAYER OF LIGHT DIESEL OIL ON THE SURFACE OF WATER STORED IN TANKS.

+UNDER THE PUBLIC HEALTH AND URBAN SERVICES ORDINANCE,

UPON IT IS AN OFFENCE TO ALLOW MOSQUITO BREEDING ON PREMISES. CONVICTION, AN OFFENDER IS LIABLE TO A MAXIMUM FINE OF $10 000, + HE SAID.

PRIMARY MATHS SYLLABUS TO BE SHOWN

***

A THREE-DAY EXHIBITION AND SIX HALF-DAY SEMINARS ON THE NEW PRIMARY SCHOOL MATHEMATICS SYLLABUS WILL BE ORGANISED NEXT MONTH FOR SCHOOL HEADS AND TEACHERS.

THE EXHIBITION AND SEMINARS WILL BE HELD FROM AUGUST 21 TO 23 AT GRANTHAM COLLEGE OF EDUCATION, GASCOIGNE ROAD, KOWLOON.

FOR SPACE REASONS, THE SEMINARS WILL BE LIMITED TO SCHOOL HEADS AND CONVENERS OF MATHEMATICS SUBJECT IN SCHOOLS.

APPLICATIONS SHOULD BE MADE TO THE MATHEMATICS SECTION, ADVISORY INSPECTORATE, EDUCATION DEPARTMENT, LEE GARDENS, HYSAN AVENUE, HONG KONG, BEFORE JULY 10.

ENQUIRIES SHOULD BE DIRECTED TO THE MATHEMATICS SECTION ON 5-8392488.

SHAU KEI WAN ROAD TO HAVE FOOTBRIDGE

* * *

THE ENGINEERING DEVELOPMENT DEPARTMENT IS PLANNING TO BUILD

A 30-METRE-LONG COVERED FOOTBRIDGE ACROSS SHAU KEI WAN ROAD AT THE JUNCTION OF SHING ON AND TAI ON STREETS.

IT WILL BE 2.75 METRES WIDE AND CONNECTED AT BOTH ENDS BY STAIRCASES.

AT PRESENT, THERE IS PEDESTRIAN AND VEHICULAR CONFLICT AT THIS JUNCTION AND THE SITUATION WILL WORSEN WHEN THE ISLAND LINE OF THE MASS TRANSIT RAILWAY CORPORATION STARTS OPERATION AND THE ISLAND EASTERN CORRIDOR EXTENDS TO SAI WAN HO IN MID-1985.

/CONSTRUCTION OF

Share This Page