12

TUESDAY, MARCH 13, 1984

BOTH EASTBOUND AND WESTBOUND SECTIONS OF THE SAME ROAD BETWEEN ITS TWO JUNCTIONS WITH WAN TSUI ROAD WILL BE CLOSED FROM MIDNIGHT ON THURSDAY (MARCH 15) TO 6 AM THE FOLLOWING DAY.

DURING THE CLOSURE, TRAFFIC WILL BE DIVERTED VIA WAN TSUI ROAD AND HONG MAN STREET.

AT CHI FU INTERCHANGE, THE DOWN-RAMP LEADING FROM CHI FU ROAD TO POK FU LAM ROAD SOUTHBOUND WILL BE CLOSED FROM 10 AM ON MARCH 15 UNTIL MARCH 29.

DURING THE CLOSURE, TRAFFIC WILL BE DIVERTED VIA POKFULAM GARDENS INTERCHANGE.

BUSES ON CMB ROUTES 44 AND 45 BOUND FOR WAH FU (SOUTH) WILL OPERATE VIA CHI FU INTERCHANGE, CHI FU ROAD, POKFULAM GARDENS INTERCHANGE AND POK FU LAM ROAD.

IN WAN CHAI, THE EXIT ROAD LEADING FROM THE CROSS HARBOUR TUNNEL TO NORTH POINT WILL BE CLOSED FROM 11 PM ON THURSDAY (MARCH 15) TO 6 AM THE FOLLOWING DAY.

MOTORISTS WILL HAVE TO USE THE EXIT ROAD LEADING TO CAUSEWAY BAY DURING THE CLOSURE.

THE CLOSURE WILL BE REPEATED FROM 11 PM ON FRIDAY (MARCH 16) UNTIL 6 AM THE FOLLOWING DAY.

WATER MAINS WORK IN KWUN TONG AND SAI KUNG

****

FRESH WATER SUPPLY TO SOME PREMISES IN KWUN TONG AND SAI KUNG WILL BE TURNED OFF FROM 10 AM TO 4 PM ON FRIDAY (MARCH 16) FOR MAINS WORK.

IN KWUN TONG, THE AFFECTED AREAS ARE LAM TIN ESTATE, SAU MAU PING ESTATE, SHUN LEE TSUEN, SHUN ON ESTATE, SHUN TIN ESTATE, SHUN CHI COURT, CHOI WAN ESTATE, UPPER NGAU TAU KOK ESTATE AND ALL PREMISES ÁLONG HIU KWONG STREET, HONG NING ROAD, KUNG LOK ROAD, HONG LEE ROAD AND THE SECTION OF HIP WO STREET BETWEEN SAU MAU PING ROAD AND HIU KWONG STREET.

IN SAI KUNG, THE SUSPENSION WILL AFFECT ALL PREMISES ALONG CLEAR WATER BAY ROAD BETWEEN HIRAM'S HIGHWAY AND MANG KUNG UK, INCLUDING SILVER STRAND, HANG HAU, SHAW'S STUDIO AND BAY SIDE.

IT WILL ALSO AFFECT ALL VILLAGES ALONG HIRAM'S HIGHWAY, INCLUDING THOSE FROM THE HIGHWAY TO HO CHUNG; AND ALL VILLAGES ALONG PO LAM ROAD AND IN RENNIE'S MILL AND MA YAU TONG.

13

Share This Page