SATURDAY, FEBRUARY 25, 1984
FROM 11.30 PM
12
TUNNEL SLOW LANE TO BE REPAIRED
****
ON MONDAY (FEBRUARY 27) TO 6.30 AM ON MARCH 2, SLOW LANE' OF LION ROCK TUNNEL WILL BE CLOSED TO ALL TRAFFIC TO FACILITATE REPAIR WORKS.
THE KOWLOON-BOUND
SOUTHBOUND MOTORISTS FROM SHA TIN TO KOWLOON ARE ADVISED TO USE TAI PO ROAD.
RESTRICTED HEADROOM
***
A PEDESTRIAN FOOTBRIDGE IS BEING BUILT ACROSS KWUN TONG ROAD AT ITS JUNCTION WITH THE UNNAMED ROAD NEAR BLOCK 1 OF LOWER NGAU TAU KOK ESTATE.
TO FACILITATE CONSTRUCTION, A RESTRICTED HEIGHT OF 4.75 METRES WILL BE APPLIED UNDER THE FOOTBRIDGE FALSEWORKS FOR ABOUT FOUR MONTHS, STARTING FROM MONDAY (FEBRUARY 27).
DURING THIS PERIOD HEAVY VEHICLES EXCEEDING 4.75 METRES HIGH WILL BE DIVERTED TO WAI YIP STREET OR NGAU TAU KOK ROAD.
CLEARWAY RESTRICTION
***
FROM 10 AM MONDAY, (FEBRUARY 27), THE FOLLOWING STREETS IN KWUN TONG WILL BE DESIGNATED RESTRICTED ZONES FROM 7 AM TO 7 PM DAILY -
* TUNG YAN STREET.
*
THE WESTBOUND CARRIAGEWAY OF YUE MAN SQUARE FROM ITS JUNCTION WITH TUNG YAN STREET TO A POINT ABOUT 25 METRES WEST OF THE JUNCTION.
WITHIN THE RESTRICTED ZONES, ALL MOTOR VEHICLES EXCEPT FRANCHISED BUSES AND THOSE AUTHORISED BY THE TRANSPORT DEPARTMENT WILL BE PROHIBITED FROM PICKING UP OR SETTING DOWN PASSENGERS, OR LOADING OR UNLOADING GOODS.
SALT WATER WORKS
***
SALT WATER SUPPLY TO THE ENTIRE TUEN MUN AREA WILL BE SUSPENDED FROM 10 AM ON TUESDAY (FEBRUARY 28) TO 3 PM ON THURSDAY (MARCH 1) FOR WATER MAINS WORK,