SATURDAY, FEBRUARY 18, 1984
MORE OPEN SPACE FOR KOWLOON PARK
***
AN ADDITIONAL OPEN SPACE WILL BE BUILT AS AN EXTENSION TO KOWLOON PARK IN TSIM SHA TSUI.
THE SITE, COVERING 4 668 SQUARE METRES TO THE WEST OF THE PARK IS BOUNDED BY CANTON ROAD, HAIPHONG ROAD AND KOWLOON PARK DRIVE.
THE ARCHITECTURAL OFFICE OF THE BUILDING DEVELOPMENT DEPARTMENT IS INVITING TENDERS FOR CONSTRUCTING A TWO-LEVEL OPEN SPACE ON THE SITE.
THE UPPER LEVEL, WHICH WILL OCCUPY THE SOUTHERN AND LARGER PORTION OF THE SITE, WILL BE TURNED INTO A CHILDREN'S PLAYGROUND WHILE THE LOWER LEVEL WILL BE A REST GARDEN WITH PAVILION, TIMBER ARBOURS, PLANTS AND RAILINGS.
THE OPEN SPACE WILL BE CONNECTED TO KOWLOON PARK BY AN ELEVATED WALKWAY ACROSS KOWLOON PARK DRIVE.
WORK WILL START IN APRIL AND BE COMPLETED BY SEPTEMBER.
FIRING PRACTICE AT HA TSUEN-CASTLE PEAK
*****
FIRING PRACTICE WILL TAKE PLACE AT THE HA TSUEN-CASTLE PEAK RANGE ON TUESDAY (FEBRUARY 21) FROM 8 AM TO 11 PM AND ON SATURDAY (FEBRUARY 25) FROM 8 AM TO 5 PM.
THE PUBLIC ARE WARNED NOT TO ENTER THE AREA WHEN RED FLAGS ARE HOISTED.
RESURFACING WORK ON PEAK ROAD
***
PEAK ROAD BETWEEN HOUSE NOS 60 AND 82 WILL BE CONVERTED TO ONE-LANE FOR TWO-WAY TRAFFIC FROM 10 AM TO 4 PM ON MONDAY, TUESDAY AND WEDNESDAY (FEBRUARY 20, 21 AND 22).
THE MEASURE IS TO FACILITATE ROAD RESURFACING WORK.
Page 10Page 11