WEDNESDAY, SEPTEMBER 28, 1983
6
AIRPORT TUNNEL SIGNALS FOR MOTORISTS
***
THE COMPUTERISED TRAFFIC SURVEILLANCE SYSTEM AT THE AIRPORT TUNNEL WILL BECOME FULLY OPERATIONAL FROM SATURDAY (OCTOBER 1) AND MOTORISTS WILL BE REQUIRED BY LAW TO OBEY ALL TRAFFIC LIGHTS AND LANE SIGNALS.
WARNING WILL BE MADE AGAINST OFFENCES DURING THE INITIAL PERIOD. OFFENDERS THEREAFTER WILL BE PROSECUTED.
0
ROAD OPENING
XXX
FROM 10 AM ON FRIDAY (SEPTEMBER 30), A SECTION OF MA CHAI HANG ROAD BETWEEN WONG TAI SIN ROAD AND THE SLIP ROAD LINKING MA CHAI HANG ROAD AND FUNG MO INTERCHANGE WILL BE OPEN TO TWO-WAY TRAFFIC TO PROVIDE AN ALTERNATIVE ROAD LINKAGE TO WAN TAU HOM AND LOK FU AREAS.
RESTRICTED ZONES IN TAI PO
X X X
FROM 10 AM ON FRIDAY (SEPTEMBER 30), THE FOLLOWING ROADS IN TAI PO WILL BE DESIGNATED URBAN CLEARWAY RESTRICTED ZONES DURING THE HOURS STATED
(1) 7 AM TO 7 PM ZONE
THE NORTHBOUND CARRIAGEWAY OF PO HEUNG STREET FROM ITS JUNCTION WITH NAM SHING STREET TO A POINT OUTSIDE THE TAI PO COMMUNITY CENTRE.
(2) 7 AM TO 10 AM AND 4 PM TO 7 PM ZONES
(A) NAM SHING STREET.
(B) THE SOUTHBOUND CARRIAGEWAY OF ON FU ROAD FROM ITS
JUNCTION WITH NAM SHING STREET TO A POINT ABOUT 10 METRES TO THE SOUTH OF THE SAME JUNCTION.
THE SCHEME IS DESIGNED TO IMPROVE THE JOURNEY SPEED
OF FRANCHISED BUSES AND THE GENERAL TRAFFIC CIRCULATION IN THE TAI PO MARKET AREA.