10
FRIDAY, AUGUST 26, 1983
ONE LION ROCK TUNNEL LANE CLOSED
* * *
ONE LANE OF THE NORTHBOUND TUBE OF THE LION ROCK TUNNEL WILL REMAIN CLOSED FOR ABOUT A WEEK TO ALLOW ROAD SURFACE REPAIRS TO BE CARRIED OUT.
MOTORISTS ARE ASKED TO DRIVE WITH CARE AND PATIENCE AND TO USE ALTERNATIVE ROUTES IF POSSIBLE.
TO FACILITATE REPAIR WORKS, GOODS VEHICLES OVER 2-1/2 TONS IN UNLADEN WEIGHT WILL NOT BE PERMITTED TO ENTER THE NORTHBOUND TUBE OF LION ROCK TUNNEL AS FROM TODAY.
GOODS VEHICLES FROM KOWLOON TO SHA TIN ARE ADVISED TO USE TAI PO ROAD INSTEAD.
RECLAIMED LAND OFFERED
***
THE LANDS DEPARTMENT IS OFFERING A PIECE OF CROWN LAND AT KOWLOON BAY RECLAMATION FOR SALE BY TENDER.
THE SITE, MEASURING ABOUT 2 700 SQUARE METRES, IS FOR NON- INDUSTRIAL (EXCLUDING PRIVATE RESIDENTIAL, HOTEL AND GODOWN) PURPOSES.
THE DEADLINE FOR THE ACCEPTANCE OF TENDERS IS NOON ON SEPTEMBER 3.
TENDER FORMS, NOTICES, AND CONDITIONS MAY BE OBTAINED FROM, AND TENDER PLANS INSPECTED AT THE LANDS DEPARTMENT, MURRAY BUILDING, 5TH FLOOR, GARDEN ROAD, HONG KONG THE DISTRICT LANDS OFFICE, KOWLOON WEST, KOWLOON GOVERNMENT OFFICES, 10TH FLOOR, 405 NATHAN ROAD, KOWLOON AND THE DISTRICT LANDS OFFICES OF SHA TIN, TAI PO, NORTH, YUEN LONG, TUEN MUN, TSUEN WAN, SAI KUNG AND ISLANDS.
CARRIAGEWAY SECTION CLOSED
***
THE SECTION OF SOUTH-BOUND CARRIAGEWAY OF TAI CHUNG KIU ROAD, NORTH OF FO TAN ROAD HAS BEEN CLOSED TO TRAFFIC AS FROM TODAY (FRIDAY) TO FACILITATE MAINTENANCE WORK.
THIS ARRANGEMENT IS EXPECTED TO LAST UNTIL SEPTEMBER 30.
MOTORISTS HEADING FOR TAI CHUNG KIU ROAD FROM SIU LEK YUEN ROAD ARE ADVISED TO USE NGAN SHING STREET AND SHA TIN WAI ROAD.
DURING THE CLOSURE KMB BUS ROUTES NO. 69, 84K, 85A, 86 AND 89A HAVE BEEN DIVERTED TO GO VIA NGAN SHING STREET, SIÚ LEK YUEN ROAD, CHAP WAI KON STREET, NGAN SHING STREET AND SHATIN WAI ROAD.
THE TWO BUS STOPS AT TAI CHUNG KIU ROAD NEAR BELAIR GARDEN AND RIVERSIDE PLAZA HAVE BEEN SUSPENDED.
/11