SATURDAY, JULY 30, 1983

7

AND ON THE SAME DAY AND TIME, THE FOLLOWING ROADS IN SHA TIN WILL BE DESIGNATED AS 7 AM TO MIDNIGHT DAILY RESTRICTED ZONES:-

(1)

(11)

(111)

(IV)

(V)

(VI)

(VII)

THE SECTION OF TAI PO ROAD BETWEEN LOWER SHING MUN ROAD AND A POINT ABOUT 170 METRES SOUTH OF ITS JUNCTION WITH SHING TSUEN ROAD;

THE SLIP ROADS ON TAI PO ROAD LEADING TO ROAD P3 AND TAI WAI ROAD

THE SLIP ROAD FROM ROAD P3 TO NORTHBOUND CARRIAGEWAY OF TAI PO ROAD;

THE SECTION OF ROAD P3 FROM ITS JUNCTION WITH THE ACCESS ROAD TO MEI LAM ESTATE TO A POINT ABOUT 150 METRES EAST OF THE SAME JUNCTION;

THE SECTION OF SHING HO ROAD BETWEEN TAI PO ROAD AND CHIK SHUN STREET;

THE SECTION OF CHIK CHUEN STREET FROM ITS JUNCTION WITH SHING HO ROAD TO A POINT ABOUT 25 METRES FROM THE SAME JUNCTION:

THE SECTION OF ROAD P3 BETWEEN LION ROCK TUNNEL ROAD AND ROAD P1, AND

(VIII) THE SECTION OF ROAD P1 BETWEEN SHA TIN TAU ROAD

AND ROAD P3.

WITHIN THE ABOVE RESTRICTED ZONES, ALL MOTOR VEHICLES EXCEPT FRANCHISED BUSES WILL BE PROHIBITED FROM PICKING UP OR SETTING DOWN PASSENGERS AND LOADING OR UNLOADING GOODS DURING THE SAID HOURS DAILY.

PLAYGROUND FOR CENTRAL

***

A TEMPORARY CHILDREN'S PLAYGROUND WILL SOON BE BUILT AT ABERDEEN STREET, CENTRAL DISTRICT.

THE ARCHITECTURAL OFFICE OF THE BUILDING DEVELOPMENT DEPARTMENT IS INVITING TENDERS FOR THIS PROJECT.

THE PLAYGROUND WILL OCCUPY A SITE OF ABOUT 380 SQUARE METRES AND WILL PROVIDE FACILITIES SUCH AS BENCHES, A STOREROOM AND PLAYGROUND EQUIPMENT.

WORK WILL START IN SEPTEMBER AND IS EXPECTED TO BE COMPLETED EARLY NEXT YEAR.

11