+

WEDNESDAY, JANUARY 19, 1983

19

PAYMENT MAY BE MADE AT THE FOLLOWING COLLECTION OFFICES:

HONG KONG

-

KOWLOON -

TSUEN WAN

WINDSOR HOUSE, 3RD FLOOR, 311 GLOUCESTER ROAD, CAUSEWAY BAY, HONG KONG.

PARK-IN COMMERCIAL CENTRE, 12TH FLOOR, 56 DUNDAS STREET, MONGKOK, KOWLOON.

FOU WAH CENTRE, GROUND FLOOR,

210 CASTLE PEAK ROAD, TSUEN WAN, N.T.

PAYMENT MAY ALSO BE MADE BY POST BY SENDING A CROSSED CHEQUE, PAYABLE TO HONG KONG GOVERNMENT AND ATTACHED TO THE DEMAND NOTE TO THE COMMISSIONER OF INLAND REVENUE, G.P.O. BOX 132, HONG KONG.

NEW TIMETABLE FOR DIESEL-HAULED PASSENGER TRAINS

****

THE KOWLOON-CANTON RAILWAY WILL INTRODUCE A NEW TIMETABLE FOR THE DIESEL-HAULED PASSENGER TRAINS FROM FRIDAY (JANUARY 21) TO TIE IN WITH THE COMMISSIONING OF DOUBLE TRACK AND NEW SIGNALLING SYSTEM FOR THE SECTION BETWEEN THE UNIVERSITY AND TAI PO MARKET.

THIS NEW TIMETABLE WILL BE IN FORCE UNTIL THE ELECTRIFIED SERVICE EXTENDS TO TAI PO MARKET STATION.

THERE WILL BE 32 DIESEL PASSENGER TRAINS RUNNING DAILY FROM KOWLOON TO LO WU, 16 NORTHBOUND AND 16 SOUTHBOUND, THE SAME AS AT PRESENT.

A KCR SPOKESMAN STRESSED THAT THE COMMISSIONING OF DOUBLE TRACK AND NEW SIGNALLING BETWEEN UNIVERSITY AND TAI PO MARKET STATIONS ON FRIDAY SHOULD GREATLY IMPROVE THE PUNCTUALITY OF TRAIN SCHEDULES.

COPIES OF THE NEW TIMETABLE ARE DISPLAYED AT ALL RAILWAY STATIONS.

THE TIMETABLES FOR ELECTRIC TRAINS BETWEEN KOWLOON AND SHA TIN AND EXPRESS THROUGH TRAINS BETWEEN KOWLOON AND GUANGZHOU WILL REMAIN UNCHANGED.

+THE KOWLOON-CANTON RAILWAY ALSO REMINDED THE PUBLIC NOT TO CROSS OR WALK AROUND ANY RAILWAY TRACKS, PARTICULARLY IN THE SECTION BETWEEN SHEUNG SHUI AND LO WU WHERE ENGINEERING WORKS ASSOCIATED WITH THE MODERNISATION/ELECTRIFICATION PROJECT ARE NOW IN FULL SWING, THE SPOKESMAN SAID.

/20

Share This Page