SUNDAY, JANUARY 9, 1983
ال
REFUGE COLLECTION POINT FOR SHEK WO HUI
3
THE BUILDING DEVELOPMENT DEPARTMENT IS IWIT TENDERS FOR CONSTRUCTION OF A REFUSE COLLECTION POINT AT FU HING STREET SEX WU HUT.
A DEPARTMENT SPOKESMAN SAID THAT WITH THE RAPID INCREASE IN POPULATION IN THIS PART OF THE NEW TERRITORIES, IT WAS FOUND NECESSARY TO MAINTAIN THE AREA IN A STATE OF CLEANLINESS.
THE PROJECT CONSISTS OF A STANDARD REFUSE COLLECTION POINT WHICH IS COMPLETELY ENCLOSED AND COMPRISING A LOADING BAY FOR A REFUSE COLLECTION VAN, SPACE FOR THE STORAGE OF LITTER BINS, A MEZZANINE FLOOR WITH TOILET FACILITIES, STORAGE ROOM AND A ROLL-CALL OFFICE.
THE INTERNAL WALLS OF THE STRUCTURE ARE TO BE FINISHED IN CERAMIC TILES UP TO THE CEILING AND EXTERNALLY WITH GLAZED MOSAIC TILES. ELECTRICALLY-DRIVEN ROLLER SHUTTER, TELEPHONE FACILITIES, HYDRANTS AND A WATER-POINT ARE ALSO INCLUDED.
WORK ON THE PROJECT IS EXPECTED TO START IN MARCH AND BE COMPLETED IN ABOUT SEVEN MONTHS.
TEMPORARY ROAD CLOSURE IN FANLING ****
TAI PO ROAD NEAR FANLING SWIMMING POOL WILL BE CLOSED TO TRAFFIC BETWEEN 12.30 AM AND 4.30 AM ON TUESDAY (JANUARY 11) FOR THE CONSTRUCTION OF A FOOTBRIDGE.
DURING THE CLOSURE, VEHICLES WILL BE DIVERTED VIA JOCKEY CLUB ROAD AND SAN FUNG AVENUE.
C