TUESDAY, MARCH 10, 1981
LEN
5
TRAFFIC ARRANGEMENTS IN TSUEN WAN
*****
A NEW LINK ROAD, WHICH IS NEXT TO THE STEEL BRIDGE CONNECTING KWOK SHUI ROAD AND CASTLE PEAK ROAD IN TSUEN WAN, WILL BE OPENED TO TRAFFIC WITH EFFECT FROM 10 AM ON THURSDAY (MARCH 12) TRANSPORT DEPARTMENT SPOKESMAN ANNOUNCED TODAY (TUESDAY).
A
AT THE SAME TIME, THE STEEL BRIDGE WILL BE CLOSED AND THE FOLLOWING TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED
EASTBOUND VEHICLES ON CASTLE PEAK ROAD APPROACHING FROM TSUEN WAN AND WISHING TO PROCEED TO KWOK SHUI ROAD, SHING MUN ROAD AND THE NORTHERN SECTION OF TEXACO ROAD WILL HAVE TO TURN LEFT INTO THE NEW LINK ROAD AT ABOUT 100 METRES DOWNSTREAM OF THE STEEL BRIDGE ON THE KOWLOON-BOUND SIDE OF CASTLE PEAK ROAD.
THE EXISTING GAP IN THE CENTRAL DIVIDER IN CASTLE PEAK ROAD AT ITS JUNCTION WITH TEXACO ROAD WILL BE CLOSED AND WESTBOUND VEHICLES ON CASTLE PEAK ROAD HEADING TOWARDS SHING MUN ROAD AND THE NORTHERN SECTION OF TEXACO ROAD WILL HAVE TO USE THE NEW TEXACO ROAD FLYOVER ACROSS CASTLE PEAK ROAD VIA THE SLIP ROAD ABOUT 50 METRES DOWNSTREAM OF THE NEW FLYOVER.
THE TWO EXISTING BUS STOPS UNDER THE CASTLE PEAK ROAD FOOTBRIDGE FOR ROUTES NO. 30, 48, 50, 51, 60, 66, 66M, 68, 848, 31, 31A, 35, 40, 40M, 46A AND 46B WILL BE RESITED TO THE PERMANENT BUS BAY NEXT TO THE TEXACO ROAD FLYOVER.
APPROPRIATE TRAFFIC SIGNS WILL BE ERECTED TO GUIDE
MOTORISTS.
WATER CUT IN TSZ WAN SHAN
***
THE FRESH WATER SUPPLY TO A NUMBER OF PREMISES IN TSZ WAN SHAN WILL BE CUT OFF FOR SIX HOURS FROM MIDNIGHT ON THURSDAY (MARCH 12) TO 6 AM ON FRIDAY (MARCH 13) FOR A LEAKAGE TEST.
THE AREA TO BE AFFECTED IS BOUNDED BY TSZ WAN SHAN ROAD, WAN WAH STREET AND SHEUNG FUNG STREET, INCLUDING BLOCKS 17 TO 32 OF TSZ WAN SHAN ESTATE.