SUNDAY, NOVEMBER 4, 1979
5
+HOWEVER, WHEN THE REMAINING SECTION OF THIS ROAD BETWEEN FO TAN NULLAH AND ROAD P6 IS BUILT, IT WILL PROVIDE DIRECT VEHICULAR ACCESS TO THE PODIUM FROM ROAD P6 WHICH IS CONNECTED WITH THE TRUNK ROAD NETWORK THROUGH SHA TIN,*
WORK OF THIS CONTRACT WILL ALSO INCLUDE A GROUND LEVEL ROAD WITHIN THE KCR DEPOT AND SEWER AND STORM WATER DRAINS TO SERVICE THE DEPOT.
IT IS EXPECTED THAT WORK WILL START IN JANUARY NEXT YEAR AND TAKE ABOUT 20 MONTHS TO COMPLETE.
THE ROAD HAS BEEN DESIGNED AND CONSTRUCTION OF IT WILL BE SUPERVISED BY MAUNSELL CONSULTANTS ASIA, CONSULTING ENGINEERS FOR THE NEW TERRITORIES DEVELOPMENT DEPARTMENT OF THE PUBLIC WORKS DEPARTMENT.
SHAM SHUT PO DUMP OPENS NEXT TUESDAY
*****
THE PUBLIC WORKS DEPARTMENT ANNOUNCED TODAY (SUNDAY) THAT A PUBLIC EARTH DUMP AT SHAM SHUI PO RECLAMATION, STAGE CHAU STREET WILL BE OPENED FROM TUESDAY (NOVEMBÉR 6).
1 OFF TUNG
DUMPING MAY BE CARRIED OUT BETWEEN 8 A.M. AND 6 P.M. DAILY WITH THE EXCEPTION OF SUNDAYS AND PUBLIC HOLIDAYS.
DUMPING LICENCES MAY BE OBTAINED FREE OF CHARGE ON APPLICATION TO THE CHIEF ENGINEER, DEVELOPMENT AND AIRPORT DIVISION, PWD AT THE KOWLOON GOVERNMENT OFFICES, 405 NATHAN ROAD, 14TH FLOOR.
HOLDERS OF VALID DUMPING LICENCE FOR PUBLIC DUMPS IN KOWLOON WILL BE PERMITTED TO DISCARD APPROVED SOFT EARTH, BUILDING DEBRIS AND CERTAIN SIZE OF STONES PROVIDED THEY ARE WELL MIXED WITH EARTH.
DUMPING MUST BE CARRIED OUT IN ACCORDANCE WITH THE INSTRUCTIONS OF THE DUMP SUPERVISORS.
THE PWD RESERVES THE RIGHT TO CANCEL DUMPING LICENCES AT ANY TIME OR TO CLOSE THE DUMP WITHOUT PRIOR NOTICE.
MEANWHILE, THE CURRENT PUBLIC EARTH DUMP AT GIN DRINKERS BAY WILL BE CLOSED ON NOVEMBER 10.
/6