THURSDAY, MAY 19, 1977
8
TRAFFIC ARRANGEMENTS
******
THE TRANSPORT DEPARTMENT ANNOUNCED TODAY THAT THE LEFT TURN FOR SOUTHBOUND TRAFFIC FROM TONG SHUI ROAD INTO JAVA ROAD WOULD BE BANNED FROM 10 A.M. TOMORROW (FRIDAY) FOR ABOUT EIGHT WEEKS.
SOUTHBOUND MOTORISTS IN TONG SHUI ROAD WHO WISH TO TURN INTO JAVA ROAD ARE ADVISED TO PROCEED VIA KING'S ROAD AND SHU KUK STREET.
THE ARRANGEMENTS AIM TO FACILITATE THE RECONSTRUCTION OF JAVA ROAD,
ALSO FROM 10 A.M. TOMORROW, THE EASTBOUND LANES OF THE DUAL CARRIAGEWAY SECTION OF CLEAR WATER BAY ROAD WILL BE CLOSED.
TRAFFIC USING THESE LANES AT PRESENT WILL BE DIVERTED ONTO THE OLD CARRIAGEWAY OF CLEAR WATER BAY ROAD WHICH WILL BE RE-ROUTED ONE-WAY EASTBOUND.
WESTBOUND TRAFFIC WILL PROCEED AS AT PRESENT.
APPROPRIATE TRAFFIC SIGNS WILL BE POSTED TO GUIDE MOTORISTS.
WATER CUT ***
WATER SUPPLY TO SOME PARTS OF YUEN LONG WILL BE TURNED OFF FOR FIVE HOURS FROM 1 A.M. ON SATURDAY (MAY 21) TO ALLOW THE WATER SUPPLIES DEPARTMENT TO CARRY OUT NIGHT LEAKAGE TESTS THERE.
THE AREA TO BE AFFECTED IS BOUNDED BY ON NING ROAD, KUK TING STREET, YUEN LONG MAIN ROAD, INCLUDING YUEN LONG OLD TOWN, TUNG TÀU TSUEN, TAI WAI, YING LUNG WAI, SAI PIN WAI AND SHAN PUI,
ALSO AFFECTED WILL BE THOSE PREMISES IN CASTLE PEAK ROAD AND TAN KWAI TSUEN ROAD, INCLUDING HUNG UK TSUEN, TAN KWAI TSUEN, SHEK PO TSUEN, LET UK TSUEN, SAI SHAN TSUEN, SAN UK TSUEN, LO UK TSUEN, SIK KONG TSUEN, SIK KONG WAT AND TSEUNG KONG WA.