SATURDAY, MARCH 19, 1977
TEMPORARY ROAD CLOSURES IN KOWLOON
*******
PARTS OF TWO ROADS IN KOWLOON ARE TO BE CLOSED TEMPORARILY STARTING FROM NEXT MONDAY (MARCH 21) TO FACILITATE CONSTRUCTION OF THE MASS TRANSIT RAILWAY.
A SECTION OF MIDDLE ROAD, STRETCHING FROM A POINT TWO METRES WEST OF ITS JUNCTION WITH THE WEST SIDE OF NATHAN ROAD RUNNING WESTWARDS FOR A DISTANCE OF 28 METRES, WILL BE CLOSED FOR ABOUT 13 WEEKS TO FACILITATE THE CONSTRUCTION OF THE MASS TRANSIT RAILWAY MARINER STATION WALLS.
STARTING FROM THE SAME DAY, THE JUNCTION OF PITT STREET AND THE EAST SIDE OF NATHAN ROAD WILL BE CLOSED FOR TWO WEEKS FOR WORK ON ENTRANCES TO WATERLOO STATION.
TRAFFIC SIGNS WILL BE PUT UP TO GUIDE MOTORISTS AND PEDESTRIAN CROSSINGS WILL BE MAINTAINED DURING THE CLOSURE PERIODS.
WATER CUT ****
WATER SUPPLY TO A NUMBER OF PREMISES IN MID LEVELS WILL BE TURNED OFF FOR EIGHT HOURS FROM 10 P.M. ON MONDAY (MARCH 21) TO ENABLE THE WATER SUPPLIES DEPARTMENT TO CONNECT A WATER MAIN IN THE AREA.
AFFECTED WILL BE ALL THE PREMISES IN PRINCE'S TERRACE, REDNAXELA TERRACE, CHICC TERRACE, YING FAI TERRACE, NOS. 22-28 MOSQUE STREET, NOS. 78-82 PEEL STREET AND NOS. 15-31 SHELLEY STREET.