Monday, July 3, 1972
The main quantities of work constructed are:-
Length of road on structures
Length of road on embankment
Length of ground level roads
Volume of compacted fill
Driven precast piling
Total weight of reinforcement
Total weight of insitu concrete
Precast beams
3,900 ft.
9,400 ft.
9,800 ft.
: 420,000 cubic yards
:
101,000 ft.
4,710 tons
96,000 tons
: 374 No. (total weight
13,300 tons)
Government's Consulting Engineers were Messrs.
Scott Wilson Kirkpatrick
and Partners, in association with Messrs. Freeman Fox and Partners.
The contractor for the main Canal Road Flyover across Hennessy Road
and for the main tunnel connections was Messrs. Paul Lee Engineering Co., Ltd.,
and for the extension of the Canal Road Flyover across the Waterfront Road and
for the Bowrington Canal Extension was Messrs. Fook Lee Construction Co. Ltd.
The contractor for the works in Kowloon was Messrs. Paul Y. Construction Co. Ltd.