The main quantities of work constructed are:-

Length of road on structures

Length of road on embankment

Length of ground level roads

Volume of compacted fill

Driven precast piling

Total weight of reinforcement

Total weight of insitu concrete

Precast beams

3,900 ft.

9,400 ft.

9,800 ft.

: 420,000 cubic yards

:

101,000 ft.

4,710 tons

96,000 tons

: 374 No. (total weight

13,300 tons)

Government's Consulting Engineers were Messrs.

Scott Wilson Kirkpatrick

and Partners, in association with Messrs. Freeman Fox and Partners.

The contractor for the main Canal Road Flyover across Hennessy Road

and for the main tunnel connections was Messrs. Paul Lee Engineering Co., Ltd.,

and for the extension of the Canal Road Flyover across the Waterfront Road and

for the Bowrington Canal Extension was Messrs. Fook Lee Construction Co. Ltd.

The contractor for the works in Kowloon was Messrs. Paul Y. Construction Co. Ltd.