it

1843.

1

861

a Eu J

A.

Those 200 floors that I have passed in Bonham Strand

and Wing Lok Street, I am quite sure there will be no

trouble there for 30 years at least.

What thickness ?

15.279

15-279Q.

A.

Four inches.

8v Q.

What was the specification of it ?

A.

No particular specification.

8) Q..

There must have been some specification ?

A.

15.280

13287

Chairman:-82

A.

Yes.

Humphreys :-

Roughly, one, two three. One cement, two red earth,

and three or four of stone.

I suppose cement means a great increase in the cost $282

Which do you think makes the best concrete, red earth (5283.

83

or sand ?

A.

Sand.

Shelton Hooper:-

84

Dont you think the cost would be 50% more ?

15284

A.

No, I would rather say 33% more.

152850

55 2.

You dont know the cost per yard ↑

A.

No, when I say that, I am gaying it by what I have

862.

heard the contractors say. They roughly say, one third

more for cement.

And then the cement rendering on the top, that would 15286

be inclusive in every case ?

A.

Yes. The cement floor would not be rendered.

87

90

A.

88 9.

Would it not have to be finished smooth ↑

It is one operation for the best work, so it would

be one solid blook.

Just now you said the stone to be used might go

through an inch ring ↑

A.

Yes.

PUBLIC RECORD OFFICE

Reference:-

C.O. 537

157267

89

A

Can you get a smooth floor by using that stone ?

You work it until you get all the fine to the táp. It

13288

36

RECORD OFFICE. OUT PERMISSION OF THE PUBLIC REPRODUCED PHOTOGRAPHICALLY WITH COPYRIGHT PHOTOGRAPH - NOT TO BE

LONDON

Share This Page