(A 65 )
SPECIFICATION OF TAXES, DUTIES, &c.
Act of Colonial Legislature or other Authority under which levied.
FEES OF COURt or Office, &c.,—Continued.
SCRVET OF STEAMSHIPS :—
Itein.
Test and Inspection of Steel and Other Materials when Certificates of Tests are not Produred.
Witnessing tests of steel or iron plates or bars,—15 plates or bars, or
portion thereof, tested
咖啡
**
Witnessing tests of steel or iron plates and bars included in one and
the same order and made at the same works,-15 plates and bars. in the aggregate, or portion thereof, tested
.... Witnessing special bending tests of a set of plates, etc. (ie., tests additional to those usually required by the Surveyors),-for 15, plates, or portion thereof, tested
.... Witnessing tests of steel forgings for an engine when all the forgings are made by the same maker, and not more than two visits by the Surveyor are required,—for 15 forgings, or portion thereof, tested
•
+4
A door with its own ring is counted as one article, separate doors and rings as one each.
Fee.
$ 30.00
30.00
30.00
30.00
For each additional visit beyond two made by the Surveyor in con-
nection with the tests of forgings, plates, bars, etc.
15,00
Inspection and tests of one or two steel furnaces
30.00
for each additional furnace ingladed in the same order Inspection and tests of one or two steel forgings, or steel castings for
stem, stern-post, rudder, etc., if made by the same maker
for each additional forging, or casting as the case may be, by
the same maker, included in the same order Witnessing tests of solid drawn steel steam pipes,—for ench 15, or
portion of 15, tests of the material made
for each 30, or portion of 30, pipes tested by hydraulie pressure Inspection of wrought iron steam pipes, including hydraulic tests,— for
each 15, or portion of 15, pipes inspected... Inspection and tests of boiler tubes subject to external pressure:-
Lapwelded iron tubes and kapwelded or solid drawn steel tubes
for which a stress greater than that allowed for iron is notį requirel, for the first 100, or part of 100, tubes for each succeeding 100, or part of 100, tales
15.00
30.00
15.00
30.00
30.00
Ordinance 10 of 1899,
30.00
Table C.
30.00
22.50
Lapwelded or solid drawn steel tubes for which a stress greater than
that allowed for iron is required.
for the first 100, or part of 100 tubes.
45.00
for each succeeding 100, or part of 100 tubes
30.00
Inspection and tests of boiler tubes subject to internal pressure,
for each 15 or portion of 15 tested for tensile strength and
ductility
30.00
22.50
J
for each i or portion of 90 tubes tested by hydraulie
pressure
Inspection test and stamping of superheater headers for stock,—for each 15 or portion of 15 tubes tested for tensile strength and byj bending, in one order
-
ני
for each 50 tubes or portion of 50 tubes stamped in one order for each visit beyond two made in connection with the order: Inspection of plates after flanging or working,-for each 15, or
portion of 15, inspected at the ame timo
(The fees for witnessing tests of plates, bars, forgings, etc., cover one order only, and separate fees must be paid for each order, although the plates, bars, etc., for different orders may be tested at one time).
Testing bronze propeller blades for ships not under survey for passen- gor certificate when all the castings are made by the same maker. for the same ship and not more than two visits by the Surveyor are required.—för 4 or fewer castings tested
for each additional visit beyond two made by the Surveyor..!
30.00 30.00
15,00
30.00
30.00
15.00
05