(A 51 )
SPECIFICATION OF TAXES, DUTIES, &c.
Act of Colonial Legislatu re or other Authority under which levied.
FERS OF Court or Öffice, &c.—Continued.
SURVEY OF Steamship$:-
Item.
(A double-ended boiler is to be counted as two single-ended boilers).
Fec.
20
Ordinance 10 of 1899,
Table C.
Survey of marine boilers
Survey of mountings for one marine boiler
for every additional similar set
Survey of one evaporator
Survey of one food heater
+
Survey of one food filter...
+
Survey of one distiller...
•
Survey of one water circulator
:
See Regula- tion 17.
... $ 30
15
25
15
15
15
15
15
GO
20
for each additional evaporator, food heater, food filter, distiller
or water circulator
Survey of an installation for burning oil fuel $40 plus $20 for first
boiler, minimum
...
for every additional boiler
(A double-ended boiler is to be counted as two single-ended boilers),
Survey during construction of heaters and filters for use in connection
with oil-fuel installations, for each item inspected.
Survey of one or two safety valves
++
for every additional "similar safety valve included in the same
order
+
+++
Inspection of finished manhole doors and compensating rings,-for
the first 15, or portion of 15, inspected at the same time...
for each additional 15, or portion of 15, included in the
same order and inspected at the same time
Test and Inspection of Steel und Other Materials when Certificates of Tests are not Produced.
Witnessing tests of steel or iron plates of bars,—15 plates or bars, or
portion thereof, tested
Witnessing tests of steel or iron plates and bars included in our and the same order and made at the same works,—15 plates and bars in the aggreate, or portion thereof, tested... Witnessing special bending tests of a set of plates, etc. (ie., tests additional to those usually required by the Board of Trude),—for 15 plates, or portion thereof, tested Witnessing tests of steel forgings for au engine when all the forgings are made by the same maker, and not more than two visits by the Surveyor ure required, for 15 forgings, or portion thereof. tested
...
A door with its own ring is counted as one article, separate doors and rings as one each,
For each additional visit beyond two made by the Surveyor in con-
nection with the tests of forgings, plates. lars, etc.
Inspection and tests of one or two steel furnaces
+4
•
J
for each additional Furnace included in the same order Inspection and tests of one or two steel forgings, or steel castings for
stem stern-post, rudder, etc.,, if made by the same maker
K9
5
10
1.
20
10
20
20
20
for each additional forging, or casting as the case may be, by
the same maker, included in the same order Witnessing tests of solid drawn steel steam pipes,—for each 15, or
portion of 15, tests of the material made
1+
20
for each 30, or portion of 30, pipes tested by hydraulic pressure Inspection of wrought iron steam pipes, including hydraulic test,— for
each 15, or portion of 15, pipes inspected...
Inspection and tests of boiler tubes subject to external pressure:—
Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a stress greater than that allowed for iron is not required, for the first 100, or part of 100, tubes for each succeeding 100, or part of 100, tubes
20
10
20
10
20
SSA A 2 SA
...!
20
20
15
51