71

(F9)

Return of all Public Works, Civil Roads. Canals, Bridges, Buildings, &c.,—Continued.

Describo the Work, and where situated.

Whether | Estimated Construel-! Expensos

ing or under

itu

Repairs. ↑ Dollars,

Whether Finished

·

Amount

Authority under

When

which it is executed,

Com- menuel,

of

or Un- linished.

Expenditure,

Public Works, Extraordinary, —- Contd.

COMMUNICATIONS,

Colonial Estimates 1926.

¡

C.

Ronde :-

(8.) Surfacing, &e., Ronds Kowloon Tong

Development Aren,

*** strnetion, 100,000.00]

** (r)

11.5.26

In- finished,

60,563.57

(6.) New Main Ronds,

Do.

(c.) General Works,

Drainage

50,000,000

48 (5) 43,000,00) 0.8.0, 2980 of 126 Do. {000.00

Jan., 1926 (Continuing,

2,000,00

work.

48 (c)

| Do.

Do.

13,970.32

Training Nullabs:—

+

(a.) Side wall and invért of nullah East side of Kowloon Tong Developincut Scheme,

Do.

* 75.000,00.

49 (a)

10.6.22

Un- finisher).

74,961,67

(5.) Kowloon Tang Development Aron, — Connection to Stream North of Hill Aren to wain nullah,

Do.

10,000,00

49 (6)

10.6.25

U'n- finished.

5,840.15

(c.) General Works,

10.

10,000.00 7

49 (c)

Jan., 1926 Continging

I

5,470.49

work.

Miscellancons Drainage Works:-

(4.) Main sewer from Fuk-tsun-henng to

Taipo Road,

Do.

15,000,00

50 (7)

18.7.25

Uu- finished.

(b.) Kowloon Tong Development Aron

sewerk,..

Do.

50,000.00

50 (6)

1924

Do.

*42,386.41

(c.) Kowloon Tong Development Aren, Stormwater drains, (Other thannbore)

Do.

65,000,00

50 (c)

1924

Do.

20.400.79

(d) General Works,

Do.

50,000,00

50 (4)

Jan., 1926 Continuing

35,379.21

work.

MISCELLANEOUS,

Kowloon Tong Development Scheme-

Exenvation and filling,

10.

110,ARIO UN

51

10.6.22

Un- Ginished.

44,650.00

2,500.00) c.8.0. 155 of '20

21.1.23

Do.

7,499.83

Refuse Dump, Chenug Sha Wais,

Do

5,000,00

52

China e Cometeries,

Do.

2,000,00

51

Jun,, 1926 Continuing]

1,864.93

Filling in large area at Kowloon City,

Do.

30,000,00 1

54

12.10.23.

work. CH- finished.

16,314.97

Miscellaneous Works,

Dr.

101,000,00

5.3

Jau,, 1926 Continuiop

1,704.27

work.

Public Health and BoILDINGS

ORDINANCE.

Compensation and Resumptions,

Do,

250,000 (H)

56

Do.

Do.

225,637.20

Water WORKS.

Extension of Kowloon Cutelwater,

Dr

Shet Lai Pui Reservoir and Contingent

Works,

Do.

4,000,00 €8.0. 18 in G6 of *22 10,000,00¦

57 1

18,000 00 | 4.8.0. I in 26 of *28 10,000,00

58

12.2.28 Finished.

161,960,53

30.7.28

Dn.

243,336.37

Share This Page