1852 — Page 159

Blue Books 香港計冊 All AI Reviewed

PUBLIC RECORD OFFICE

COPYRIGHT PHOTOGRAPH — NOT TO BE REPRODUCED PHOTOGRAPHICALLY WITHOUT PERMISSION OF THE PUBLIC RECORD OFFICE, LONDON

---

133

6

157

---

To the [cause] caused, much of the woodwork to decay; cement has fallen down in five or several of these places, and I fear it will be necessary to reconstruct all that portion of the defective part. I have, however, delayed making a full report of the particular circumstances and the necessary expense of the repairs until I have made further examinations upon the effects produced on these parts by the rain, a sufficiency of which has not fallen to show what I require.

In the Lower Bazaar much of my time in the early part of the year was occupied in superintending the erection of houses after the fire. As the new [houses] were being built, I desired to instil into the Chinese the great advantage to be derived from a better manner of erecting their houses — the prevention of the contact of timbers, and the benefit that would accrue to them in future years by the substitution of stone in place of wood, so plentifully used for arches and other means used in the erection of supporting frames or walls. Although they appear to have been fully alive to these circumstances, they would not carry them into effect, as they were in such a hurry to finish the dwellings that it was with the utmost difficulty I could compel them to build as directed, particularly with solid walls. Indeed, several had summarily to be pulled down, and throughout the whole district every means was tried to deceive me, and scamp work — which certainly it was more to their advantage than to mine to have properly constructed — was attempted.

The want of money, jealousies, and other matters have delayed the construction of the proposed Strand Road, so very essential a feature in the new plan of the district as the...

Edit History

2026-07-18 10:11:22 · NVIDIA / nvidia/nemotron-3-ultra-550b-a55b
Live
View comparison
AI Proofread
PUBLIC RECORD OFFICE COPYRIGHT PHOTOGRAPH — NOT TO BE REPRODUCED PHOTOGRAPHICALLY WITHOUT PERMISSION OF THE PUBLIC RECORD OFFICE, LONDON --- 133 6 157 --- To the [cause] caused, much of the woodwork to decay; cement has fallen down in five or several of these places, and I fear it will be necessary to reconstruct all that portion of the defective part. I have, however, delayed making a full report of the particular circumstances and the necessary expense of the repairs until I have made further examinations upon the effects produced on these parts by the rain, a sufficiency of which has not fallen to show what I require. In the Lower Bazaar much of my time in the early part of the year was occupied in superintending the erection of houses after the fire. As the new [houses] were being built, I desired to instil into the Chinese the great advantage to be derived from a better manner of erecting their houses — the prevention of the contact of timbers, and the benefit that would accrue to them in future years by the substitution of stone in place of wood, so plentifully used for arches and other means used in the erection of supporting frames or walls. Although they appear to have been fully alive to these circumstances, they would not carry them into effect, as they were in such a hurry to finish the dwellings that it was with the utmost difficulty I could compel them to build as directed, particularly with solid walls. Indeed, several had summarily to be pulled down, and throughout the whole district every means was tried to deceive me, and scamp work — which certainly it was more to their advantage than to mine to have properly constructed — was attempted. The want of money, jealousies, and other matters have delayed the construction of the proposed Strand Road, so very essential a feature in the new plan of the district as the...
Baseline (Original)
| PUBLIC RECORD OFFICE --:asvasajay IN COPYRIGHT PHOTOGRAPH-NOT TO BE REPRODUCED PHOTOGRAPHIC- ALLY WITHOUT PERMISSION OF THE PUBLIC RECORD OFFICE, LONDON | 133 6 157 to the caused, much of the wood work to decay, cement has fallen down in tive or these - places and I fear it will be necessary reconstruct all that portion of the defective " part; I have however delayed making a full report of the particular circumstances, and the necesary expense of the repairs, further examinations until I have made some by having upon the affects produced on these parts. the rain, a sufficiency of which not fallen to show what I sequire. In the Lower Bazaar much of y time in the early part of the year was occupied in superintending the erection of houses after the fire the fire, and much the As new I desired to instil into the Chinese the a more of erecting their houses, the great advantage to be derived from manner of erecting prevention of the contact of timbers, and careful the benefit that would accrue to them in futive years by the substitution of stone in place of wood so plentifully of arches and other incans used, the erection used, of supporting froms or walls, that although they appear to have been fully alive to these circumstan -ces, they would not them into effect. as they carry were in such a hurry to finish the dwellings, that it was with the utmost difficulty I could compel them to build as directed, particularly with solid walls, indeed, several thad summarily to pull down, and throughout the whole district, Every means was tried to deccave me, and seamp work, which certainly it was advantage than to mine to have properly Constructed. The went of money jealousies, and other matters have delayed the construction of the proposed Strand Road; so very essential a feature in the new plan of the districtz as more to their pthe
2026-07-18 10:11:22 · Baseline
View content

| PUBLIC RECORD OFFICE

--:asvasajay

IN

COPYRIGHT PHOTOGRAPH-NOT TO BE REPRODUCED PHOTOGRAPHIC- ALLY WITHOUT PERMISSION OF THE

PUBLIC RECORD OFFICE, LONDON |

133

6

157

to

the

caused, much of the wood work to decay, cement has fallen down in tive or these - places and I fear it will be necessary reconstruct all that portion of the defective " part; I have however delayed making

a full report of the particular circumstances, and the necesary expense of the repairs,

further examinations

until I have made some

by

having

upon the affects produced on these parts. the rain, a sufficiency of which not fallen to show what I sequire.

In the Lower Bazaar much of y time in the early part of the year was occupied in superintending the erection of houses after the fire

the fire, and much

the

As

new

I desired to instil into the Chinese the

a more of erecting their houses, the

great advantage to be derived from manner of erecting prevention of the contact of timbers, and

careful

the benefit

that would accrue

to them in

futive years by the substitution of stone in place of wood so plentifully of arches and other incans

used, the erection

used,

of supporting froms or walls, that although they appear to have been fully alive to these circumstan -ces, they would not

them into effect.

as

they

carry

were in such a hurry to finish

the dwellings, that it was with the utmost difficulty I could compel them to build as directed, particularly with solid walls, indeed, several thad summarily to pull down, and throughout the whole district, Every means was tried to deccave me, and seamp work, which certainly it was

advantage than to mine to have properly Constructed.

The went of money jealousies, and other matters have delayed the construction of the proposed Strand Road; so very essential a feature in the new plan of the districtz as

more

to their

pthe

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.