PUBLIC RECORD OFFICE
TIT
C.O. 133
Reference :---
COPYRIGHT PHOTOGRAPH-NOT TO BE REPRODUCED PHOTOGRAPHIC-|
PUBLIC RECORD OFFICE, LONDON
1 ALLY WITHOUT PERMISSION OF THE
[40]
RETURN of all PUBLIC WORKS, CIVIL ROADS, CANALS, BRIDGES,
[41]
BUILDINGS, &c. &c. not of a Military Nature, which have been undertaken during the Year.
If Bihack,
If undhalabed, actual Armowest of | kusment of Exya
diture up Expenditure
present Dude
Fund
Whether constracting
Describe the Work, and where situated.
se under Repair.
Estimated Expecte
in Porticis Bierling.
Authority under which it is axuented.
from which the Exponer
in defrayed.
When
ecendenced.
Whether fizished
or uzimished.
Founde Bierling-
Fenada Berling.
Avil loads
Completion of Rucen's Road, Keloria. Eming draining surface of Queen's con Formation of thests in Retoria.. Jamation of Bruckhill Kelinian Cras Angniching to lookipa.. Jorkurper to Sairan..
#
#
to Chikchro(inland, & mets)
Cendry repairs to Roads.
Frains & Sewers.
Constructing.
Repairs. Repairs.
Z. 14.
1,300,0.0
0 Festiveline of Me & the Sur
36 7.10.0 (lepítik. N°2 affered by M
2147.8.8.86.
1.939.14
7. 870.
433, but R&E. N°7%
3.3 babala UE.. Fre
tour
Instructions off. 2. the
#
Trains under Queen's road ficteria Constructing 5441u13ald REV tappaved by Me
De:additional des
▾
•
under Nur Krects.
Drains sundry Repairs.
An
Repairs
Harber Boskisha Hallister, Katoria. Constructing
Shaming Heregneichung flockävupe ballin Levelling Chinuselication, Inpinychan
Becildings
C:
Houses for bort. Officers (Albany ketone Constructing.
1p25.18.4 XzZ.N.4.
3918.4.0 BGE.P5.
bestructions of 2 the
357.39 288-973 appead by N. 2.
Govern
223, 11.23 Instructions of N2 the for
Kitchens in rear of boot : House..
404850 3 als Inchicchons of 1.2. the
876m 4.0
Jonepurary Church, Kelmia.
X4
De:
Freeporary Court House, ketoria.
Repairs & Recstme. If H. Z the Garna Repairs.
Cort of Magistrales Offiang Koterias
Kering buildings repaired, tetoria.
-
Dex
For
Contingent looks not classified. Constructing.
22.76418004
Enderich Gr 2. Bucce
Rincipally from the Instalments of the Indemnicly bong received fro
Chinese Government, and partly from the local
Revernces
of
the
Colony.
Sept 1844 unfinished.
unfinished.
June, 1842 finished 1268.8.0%
2008.3.1 Expanded in 143.
.
121.15.1 2,675.6.7% 61 703-111
1963.7-77
November, infinished
Betiber.
*
"
finisher. 433.b.l
November unfinished Lauder finisher: 87.0.0.
finisher 123.17.11.
August. 1800 unfinished.
anfirnished.
Jeffr
Beth
A
unfinished. finisher.
shoptr 1844 unfinished.
April
#
finished. 180.149
June. finished. 1943, 70%
A
42401
hot 1843. finished, hawen 408 Sept 1845. fiche. 158.8.12 May, 1864 finished. 260.18.572 finisher.. 192012077 finished. 2740 90117
Septe June
fun to do furnished. 24/412.10.
·
of foreished. 60-170lt finished. 11201074
325,8.Pİ
550.1541
1622 Ma
325,000
9,66713.57 7621.12.17
fortingent linksmit conder Special Edirnad
€2192.1344spered in 145. £35710
Estivviated cost veel spraisin
as then work were stresitin
mdernummer
med de las t
·Elimatis, tirpark -
contingent looks without Special Enterates.
Predict Mr 2. Rences
22