to be delivered to Registrar in respect of existing boilers and pressure reccivers and powers pf Principal Surveyor

whene

documents

not delivered, Etc.

12

PART III

REGISTRATION OF BOILERS, PRESSURE RECEIVERS AND

STEAM CONTAINERS.

Boilers, pressure receivers (other than pressure vessels) and steam containers.

11. (1) Prior to the examination of the boiler or pressure receiver in accordance with section 23, the owner of an existing boiler or pres- sure receiver, other than a pressure vessel, shall, whenever such docu- ments are available, deliver to the Registrar in respect of the boiler or pressure receiver two copies of each of the following documents-

(a) the maker's certificate;

(5) where the boller or pressure receiver was constructed in the Colony, a certificate as to the inspection thereof during con- struction issued by a person who the Registrar considers suitably qualified;

(c) where the boiler or pressure receiver was not constructed in the Colony, a certificate issued in respect of the boiler or pressure receiver by a recognized inspecting authority in the country in which it was constructed; and

(d) any certificate issued by a recognized inspecting authority in respect of any extensive repairs or any alterations or additions made to the boiler or pressure receiver or its auxiliary equip- ment elsewhere than in the Colony.

(2) (4) Where the documents specified in subsection (1) are not delivered to the Registrar and where such of those documeats as are delivered to the Registrar do not, in the opinion of the Principal Surveyor, provide sufficient evidence to enable him to make an assessment of the maximum permissible working pressure at which the boiler or pressure receiver, as the case may be, may be operated, the Principal Surveyor may, by notice in writing, require the owner of the boiler or pressure receiver 10 cause the same to be surveyed at the expense of the owner by an appointed examiner.

(5) The appointed examiner who carries out any such survey shall, on the result of his survey, prepare, and deliver to the Regis- Icar, plans of the boiler or pressure receiver and its auxiliary equipment showing the materials used in, and the method of the construction thereof, the dimensions of every part and fitting thereof and such other particulars as the Principal Surveyor may specify.

(c) Where any plans delivered to the Registrar pursuant to para- graph (b) do not, in the opinion of the Principal Surveyor. provide sufficient evidence to enable him to make an assess

13

ment of the maximum permissible working pressure at which the boiler or pressure receiver may be operated, the Principal Surveyor may, by notice in writing, require the owner of the boiler or pressure receiver to cause an appointed examiner to produce, at the expense of the owner, further plans showing such particulars of the boiler or pressure receiver as may be specified in the notice.

12. Prior to the first examination of the steam container in accord- Documents ance with subsection (1) of section 28, the owner of an existing steam to be container shall deliver to the Registrer in respect of the steam con- delivered to

Registrar in respect of existing Ream containers.

tainer-

(a) two copies of the maker's certificate; or

(b) two copies of a plan thereof prepared, to the satisfaction of

the Principal Surveyor, by a boiler inspector.

delivered to

13. The owner of a new boiler or pressure receiver, other than pocuments a pressure vessel, shall, not less than thirty days preceding the day on to be which he intends to put the same into use or, if the boiler or pressure Registrar to receiver is put into use within thirty days after the commencement of respect of this Ordinance, as soon as practicable, deliver to the Registrar in respect and pressure thereof-

(a) where the boiler or pressure receiver was constructed in the Colony, two copies of the certificate of inspection during con- struction; or

(b) where the boiler or pressure receiver was not constructed in the Colony, two copies of the maker's certificate and two copies of a certificate issued in respect of the boiler or pressure receiver by a recognized inspecting authority in the country in which it was constructed.

www boilers

receivers.

14. The owner of a new steam container shall, not less than thirty Documenta days preceding the day on which he intends to put the same into use lp Do

delivered to if the steam container is put into use within thirty days after the Registrar in commencement of this Ordinance, as soon as practicable, deliver to the respect of Registrar in respect thereof—

or.

(a) two copies of the maker's certificate; or

(b) two copies of a plan thereof prepared, to the satisfaction of the

Principal Surveyor, by a boiler inspector.

DIEVE LIGJIN containers.

15. Every copy of a document that is delivered to the Registrar Documents pursuant to subsection (1) of section II or section 12, 13 or 14 shall to be have endorsed thereon a declaration by an appointed examiner that it

certified by appointed relates to the boiler or pressure receiver in respect of which it is so examiner. delivered.