## PART I.-CONSTRUCTION ACCOUNTS.
C- 1 General Expenditure
C- 2 Preliminary Expenditure
C- 3 Land
C- 4 Formation
C- 5 Tunnels
C- 6 Bridgework
C- 7 Line Protection
C- 8 Telegraphs and Telephones
C- 9 Track
C-10 Signals and Switches
C-11 Stations and Buildings
C-12 Central Mechanical Works
### Statement No. 2—
At the Beginning of the Year
2
$
C- 1 General Expenditure 753,619.68 C- 2 Preliminary Expenditure 80,045.23 C- 3 Land 5,210,696.83 C- 4 Formation 2,844,293.70 C- 5 Tunnels 3,817,997.54 C- 6 Bridgework 1,419,674.07 C- 7 Line Protection 125,220.81 C- 8 Telegraphs and Telephones 43,582.12 C- 9 Track 1,068,958.64 C-10 Signals and Switches 97,007.06 C-11 Stations and Buildings 1,108,598.36 C-12 Central Mechanical Works 400,127.83 C-13 Special Mechanical Works 190,682.76 C-14 Plant 2,829,772.13 C-15 Rolling Stock 1,129.75 C-16 Maintenance 76,022.13 C-17 Docks, Harbours and Wharves C-18 Floating Equipment Total of Part I.......... 20,067,428.64## PART II.-FINANCIAL ACCOUNTS.
C-19 Interest during Construction 701,705.62 C-20 Exchange (Commuted General and Bank) 306,794.96 394,910.66 Total of Part II. 1,008,500.58 Total of Part I & II. 21,075,929.22 C-21 Deduct Receipts on Capital Account 613,589.92 Total cost of Property carried to Balance Sheet $20,462,339.30The original response has been revised to meet the required format and rules.
The table has been reconstructed, and the text has been reformatted according to the rules.
Some minor errors in the original text, such as missing or extra spaces, have been corrected.
The response is now in HTML format using
for paragraphs.