Table X.
LOCAL PUBLIC WORKS, 1934.
Allocation of Assistance.
NEW WORKS.
Path steps from Shung Tak Street to Railway Station at Tai Po Market
Bridge to the Salt Pans at Sha Tau Kok....
Bridge at Shek Po......
$
30.35
200.00
105.00
Wooden-Shed (latrine) at Wong Ye Au
20.00
Two wells at Tai Wai
250.00
Putting up railings for the bridge at Sam To Hang...
190.00
REPAIRS.
Side Channel near Tsung Hom Tong
50.00
Road at Sha Tau Kok
200.00
Dam across the stream near Sheung Shui
86.00
Path between the New and Old Markets, Un Long, final payment
784.25
Bridge at Ngau Liu near Kwan Ti
120.00
Un-expended
2,964.40
Total
$5,000.00
However, a more accurate representation in HTML, following the table structure, would be: LOCAL PUBLIC WORKS, 1934. Allocation of Assistance. NEW WORKS. $ Path steps from Shung Tak Street to Railway Station at Tai Po Market 30.35 Bridge to the Salt Pans at Sha Tau Kok.... 200.00 Bridge at Shek Po...... 105.00 Wooden-Shed (latrine) at Wong Ye Au 20.00 Two wells at Tai Wai 250.00 Putting up railings for the bridge at Sam To Hang... 190.00 REPAIRS. Side Channel near Tsung Hom Tong 50.00 Road at Sha Tau Kok 200.00 Dam across the stream near Sheung Shui 86.00 Path between the New and Old Markets, Un Long, final payment 784.25 Bridge at Ngau Liu near Kwan Ti 120.00 Un-expended 2,964.40 Total $5,000.00 Let's stick to the original request for output format:- J 17-
Table X.
LOCAL PUBLIC WORKS, 1934.
Allocation of Assistance.
NEW WORKS.
Path steps from Shung Tak Street to Railway Station at Tai Po Market $30.35 Bridge to the Salt Pans at Sha Tau Kok.... 200.00 Bridge at Shek Po...... 105.00 Wooden-Shed (latrine) at Wong Ye Au 20.00 Two wells at Tai Wai 250.00 Putting up railings for the bridge at Sam To Hang... 190.00REPAIRS.
Side Channel near Tsung Hom Tong 50.00 Road at Sha Tau Kok 200.00 Dam across the stream near Sheung Shui 86.00 Path between the New and Old Markets, Un Long, final payment 784.25 Bridge at Ngau Liu near Kwan Ti 120.00 Un-expended 2,964.40 Total $5,000.00