The reconstruction of the Aberdeen Lower Level Dam was completed in September, but unfortunately the dry season had by then set in and it was only possible to impound about ten million gallons.
The adoption of Universal Meterage is referred to under Water Account (Meters) in Paragraph 56.
The total quantity of water stored in the impounding reservoirs on 1st January amounted to 1613.53 million gallons, of which 492.42 million gallons were in the gravitation reservoirs and 1121.11 million gallons in the low-level reservoirs requiring pumping. Storage reached a minimum on the 2nd June when the total was 510.16 million gallons, 174.54 million gallons being in the gravitation reservoirs.
The reservoirs were at or over their permanent overflow levels for the following periods:
Reservoirs Capacity to permanent overflow level (million gallons) Overflow Periods Tai Tam 384.80 68 days at various times between 6th July-21st September Tai Tam Byewash 22.40 43 days at various times between 22nd July-20th September Tai Tam Intermediate 195.90 101 days at various times between 24th July-1st November Tai Tam Tuk 1,419.00 65 days at various times between 1st August-4th October Wong Nei Chong 30.34 27 days at various times between 25th July-14th September Pokfulam 66.00 37 days at various times between 16th June-21st September Aberdeen Upper 173.23 10 days at various times between 31st July-19th September Aberdeen Lower 80.00 Nil