Sketch Plans, etc.
Q 124
Administration Block. This building comprises offices for Supt., Assistant Supt. and Clerical Staff together with Store Rooms for Prison supplies and products and minor workshops.
Punishment Block. This contains cells for the isolation of punishment prisoners together with the Execution Room and Condemned Cells adjoining it.
Workshops. These consist of four isolated two-storey buildings arranged between the cell wings of the main building, each floor consists of a large room for the employment of Prisoners in various trades.
Printing Shop. This is a larger workshop which will be equipped with machinery for the employment of prisoners in the chief industry of the establishment, printing.
Baths and Laundry Building. This is a one-storey building containing a large Bath Room of about 50 baths and a Laundry establishment equipped with Washing Tubs and Laundry machinery.
Hospital. The Ground Floor of this building contains Waiting Hall, Inspection Room, M.O's Room, Dispensary, 8 Hospital Cells, a twenty-bed Chinese Ward, Kitchen, etc. The first floor contains Operating Theatre, Isolation Ward, a twenty-five-bed Chinese ward, a seven-bed Indian Ward and a seven-bed European Ward. The total accommodation is about 70 beds.
(2) Staff Quarters. No plans of these have yet been prepared but the following is a list of the Staff required together with the class of Quarters it is proposed to erect.
1 Superintendent Married. Detached house. 1 Asst. Superintendent "" ... 4-roomed Flat. 1 Medical Officer "" 1 Chief Warder 3-roomed Flat. 1 Asst. Chief Warder Hostel with separate cubicles. 1 Storekeeper 2-roomed Flats. 1 Pharmacist 10 Principal Warders. 20 Warders Single. 30 Warders Barracks. 6 Indian Principal Warders Married. 50 Indian Warders Single. 100 Indian Warders Barracks. Coolies and Asst. Principals... Married. 6 Chinese Clerks Small 2-roomed Tenements. 10 Chinese Cooks and 30 Chinese Messengers, Motor Drivers, etc. Single room Tenements.