P.W.E. Hong Kong.
Q 76
Alterations of Existing Stormwater Drains in Wanchai:
Size Description Length Locality Position Remarks 18" Stormwater Drain 71 Praya East Morrison Hill Road Completed 12″ " 153 Praya East Yee Woo Street "Water Mains.—72 feet of 10" main were laid at junction of Johnston and Hennessy Roads.
The following table is an analysis of the total expenditure during the year: —
Head of Expenditure Expenditure during 1930 Cta Contract No. 12 of 1921 65,212.32 Dredging Alteration of Existing Sewers 55,819.10 Alteration of Existing Stormwater Drains 4,919.50 Water Mains 1,046.63 Roads 132,990.27 Salaries and Supervision 11,777.32 Advance Account Contract No. 12 of 1921 Items subsidiary to but not included in Bonus Payment on Contract No. 12 of 1921.. Total $271,765.14The total cost of carrying out the Scheme amounted to $5,421,493.38 of this amount $271,765.14 was expended during 1930.
Page 630
Page 631