S 38

COST ASSIGNMENT AND STATISTICS.

PART III-MISCELLANEOUS.

Previous Year. Current Year.

$ 6,296.29 $ 5,942.47

.1953 .1862

3. 774.18 735.83

4. 95.29 116.14

.01845 .01993

.00326 .00298

1. Average cost of repairs per Locomotive per annum

2. Average cost of Locomotive repairs per engine mile

Average cost of repairs per passenger car per annum...

Average cost of repairs per goods wagon per annum ...

5. Average cost of Lubricants per engine mile for Locomotives

...

6. Average cost of Lubricants per train mile for passenger and goods carriages etc.

PART IV.—MAINTENANCE COST PER MILE.

Mean mileage maintained by Revenue.

Single track Second track Loops Sidings Main Line.

Miles.

21.76 2.01 9.85 33.62

Total cost of Head "E-5-5 Track

$63,004.66

Previous Year. Current Year.

$1,331.64 M.L. $1,874.02

Cost per mile. $1,874.02

147 24 F.B.

Share This Page