J 8

Table E.

LOCAL PUBLIC WORKS, 1929.

New Works.

Making of survey pickets in connection with the lay-out at Yun Long Market
Making a well and a path at Tai Po

$
20.00
185.00

Repairs.

Road between Fung Yuen and Sha Lo Tung
Road from Lin Au to Siu Om Shan
Road from Chung Pui to Wang Shan Keuk
Pier near Island House, Tai Po
Bridge at Yau Tin
Bridge near Kwan Ti
Matsheds for the Agricultural Show at Sheungshui
Road near the pier at Castle Peak
Path to the summit of Castle Peak
Un-expended

$
100.00
50.00
100.00
440.00
90.00
400.00
1,000.00
100.00
800.00
1,765.00

TOTAL

$5,000.00

Table F.

1929.

RAINFALL AT TAIPO POLICE STATION.

1929 Average 1924-1928 January, Inches. Inches. February, 1.48 4.07 March, 1.07 15.97 April, .66 21.37 May, 3.43 19.69 June, .08 12.58 July, 4.02 8.95 August, .97 9.55 September, 8.00 6.35 October, 3.39 Nil November, 10.45 5.04 December, 1.82 2.41 TOTAL, .63 .35 56.60 85.73
Share This Page