P.W.E. New Kowloon

Size. Description. Length. Locality. Position. Remarks. 12" Sewer 215' Cheung Sha Wan 6" 6" 84" & 81" Stormwater drains 39'..48" "" 358' 31 120' In street North West of N.K.I.L. 356 to scavenging lane of N.K.I.L. 182. In scavenging lane of N.K.I.Ls. 182 and 471. In scavenging lane of N.K.I.Ls. 522 and 550. Kowloon City From Boundary line (K) North of K.I.L. 1459 across Recreation Ground and due North in 60 road in the direction of Kowloon Old City. Cheung Sha Wan From N.K.I.L. 420 to streamcourse South East of N.K.I.L. 362 on Castle Peak Road. Completed Not completed 6" Sewer Shamshuipo In scavenging lane of N.K.I.Ls. 606 and 610.

The number of drain connections made was 138.

1926 Estimates, $50,000.00

1926 Net Expenditure to 31.12.26 (from Government funds), $33,379.21

1926 Expenditure to 31.12.26 (contributions by various lessees), $455.30

$33,834.51

Many new gullies were constructed and connected to the stormwater drainage system.

Share This Page