P.W.E. New Kowloon

Size. Description. Length. Locality. Position. Remarks.

6" Sewer Kaulung toug In scavenging lane, West of block O. Not Completed 9" 7: 6" " From nullah in 40′ road, South of U. and T. 9" In scavenging lane between W. X. and Y. 9' 6" Sewers. 102 From opposite scavenging lane T. V. to A. (2nd section) alongside Railway, 6" Sewer. In street south of A. (2nd section). ! In scavenging lane between A. and B. (2nd section). 1926 Estimates, $50,000.00 Total Estimates, $120,000.00 1926 Expenditure, $42,386.41 Expenditure to 31.12.26, $ 81,309.26

(c.) Kaulungtong Development Area, stormwater drains.— The following are the most important stormwater drains laid during the year:---

Size. Description. Length. Locality. Position. Remarks. 15" & Stormwater drains. 310 Kanlungtong. In scavenging lane Completed 15" 127 24" 21" 135' In scavenging lane behind J. 18" 15" 3 In 40' road between J. and I. 12" & 9" 135' In 40' road east of A. B. and C. ५ 14 * 945' M.L. 27 I :

>>


>>